AUSTRALIA · TENDER
Request for Quotation for Aquatic Centre Pool Servicing
🏊 Aquatic Centre Pool Servicing Opportunity Broken Hill City Council is seeking quotations for comprehensive servicing and maintenance of its aquatic facilities, including the 25m, 50m, and children's pools. This project is critical for maintaining hygiene standards and ensuring the long-term durability of the city's recreational assets. The procurement foc…
Key facts
- Buyer
- Broken Hill City Council
- Location
- 240 Blende St, Broken Hill, NSW 2880, Australia
- Status
- Closed
- Opened
- 04 Feb 2026
- Closed
- 18 Feb 2026
- Decision
- 25 Feb 2026
- Categories
- Building Trade, Repairs, Maint., Chemicals, Biochemical, Gas, Cleaning Services, Equip, Supplies
Summary and scope
The scope of works shall include, but not be limited to, the following:Pool Preparation• Isolation of pools and coordination of shutdown periods.• Controlled drainage of the 25m, 50m and kids pools.• Protection of surrounding finishes, fixtures, and plant.• Preparation of deck for cleaning and regrouting, including any necessary protective measures.Deep Cleaning• High-pressure or approved mechanical cleaning of pool surfaces (walls, floors, steps, ledges, gutters) and decks.• Removal of calcium scale, mineral deposits, algae, biofilm, rust and staining.• Cleaning of tile surfaces and grout lines to a uniform finish.• Use of chemicals and cleaning methods that are suitable for aquatic environments and compliant with Australian Standards.• Clean mould stains in entryway to 25m pool and repair any defects to prevent further mould damage.Tile and Grout Works• Inspection of existing grout condition across both pools.• Removal of failed, cracked, loose, or missing grout.• Regrouting of affected areas using pool-grade, waterproof grout suitable for chlorinated environments.• Minor tile repairs or replacement where tiles are loose or damaged (subject to inclusions/exclusions).• Repainting of Paint Strips near pool entry.Finishing and Recommissioning• Final clean-down of pool surfaces post-grouting.• Assistance with pool refill.• Visual quality check to confirm works meet specified outcomes.The works are to be staged to minimise operational disruption. Cleaning of the 25-metre pool is required to commence by March 2026. Works to the 50-metre pool and the kids pool are to be scheduled during the winter closure period.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records.