AUSTRALIA · TENDER
Request for Quotation for Remedial Repairs for Lifeline Shed
🏗️ Project Overview Broken Hill City Council is seeking quotations for urgent remedial repairs to the Lifeline Shed, located within the Broken Hill Waste Management Facility. The facility is currently experiencing structural challenges, including slab subsidence and frame displacement, which require professional intervention to ensure long-term stability an…
Key facts
- Buyer
- Broken Hill City Council
- Location
- 240 Blende St, Broken Hill, NSW 2880, Australia
- Status
- Closed
- Opened
- 13 Feb 2026
- Closed
- 04 Mar 2026
- Decision
- 11 Mar 2026
- Categories
- Building Trade, Repairs, Maint., Construction & Operation
Summary and scope
The project aims to address the structural and operational challenges at the Lifeline Shed, locatedwithin the Broken Hill Waste Management Facility. The scope of work includes the following keycomponents:1. Electrical Infrastructure Temporarily isolate and disconnect power to the shed as required.Provide temporary power to maintain operations during the repairs, if needed.Replace and test cables to mitigate potential strain or damage.2. Temporary Structural Adjustments Remove external and internal fixtures, including downpipes, floodlights, signage, roller doors, and personal access (PA) doors, to facilitate access for repairs. Remove external cladding and associated fixing tracks in affected areas.3. Concrete Floor Slab Repairs Remove and replace concrete slab panels showing signs of subsidence. Excavate and recompact the base layer beneath affected panels, applying new road base fill to level the surface. Install new full-depth expansion joints and dowel connections to ensure structural stability. Pour and finish new reinforced concrete slabs.4. Frame Remediation Assess the footings of the portal frame columns after slab removal. Lift and stabilize the frame to address displacement. Replace or reinforce footings as needed, and resecure horizontal members, cladding, roller doors, and PA doors.5. Road Surface Restoration Remove and replace sections of the road surface adjacent to the shed that show signs of subsidence. Excavate, recompact, and rebuild the road base, followed by resurfacing with bitumen.6. Optional Geotechnical Stabilization Assess and stabilize surrounding areas using advanced geotechnical methods, such as slab lifting and ground stabilization, to prevent further subsidence.Timeline:The project will be required to commence in March 2026 and be completed by May 2026.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records.