Tender 1437 - Kilcoy Aquatic Centre – Pool Finishes Replacement
Location: 2 Redbank St, Esk, QLD 4312, Australia
Buyer: Somerset Regional Council
Opened: Feb 25, 2026
Closing: Mar 20, 2026
Building Products & MaterialsBuilding Trade, Repairs, Maint.Construction & OperationMechanical Plant, Equip, ServicesSport, Recreation Equip, Services
### 🏊 Project Overview
Somerset Regional Council is seeking a qualified principal contractor for the **Kilcoy Aquatic Centre – Pool Finishes Replacement** project. This tender involves the comprehensive replacement of failing tiled finishes at an existing facility in Kilcoy, Queensland. The facility, originally constructed in 2008, requires urgent remediation of its aquatic surfaces to maintain safety and operational standards.
### 🛠️ Scope of Work
The primary scope includes the full replacement of the tiled finishes for the **25m lap pool** and the **program pool**. Additionally, there is an optional item for the replacement of the aging pebblecrete finish on the shallow toddler pool and water feature, contingent upon cost evaluations. While Council provides initial specifications and drawings, the successful contractor will be responsible for the detailed design and coordination of the final installation.
### 📋 Key Requirements
* **Mandatory Site Inspection:** A compulsory briefing will be held on **Monday, 9 March 2026, at 10:30 AM** at the Kilcoy Aquatic Centre. Failure to attend will render bidders ineligible.
* **Expertise:** Bidders must demonstrate proficiency in tiling, waterproofing, and pool plant equipment.
* **Location:** The project is situated in Kilcoy, QLD, with service regions extending across West Moreton and South East Queensland.
### 🎯 Desired Outcomes
The goal is to deliver a high-quality, durable finish for the aquatic facility that ensures long-term structural integrity and aesthetic appeal. Key deliverables include the removal of existing failed systems and the installation of new, compliant tiling and waterproofing solutions.