AUSTRALIA · TENDER

WT10-25/26 Expression of Interest Wetalla Electrical Renewal Project Early Contractor Involvement

🏗️ Project Overview Toowoomba Regional Council (TRC) is seeking Expressions of Interest (EOI) for the Wetalla Electrical Renewal Project. This project involves the renewal of critical electrical infrastructure at the Wetalla Water Reclamation Facility, which has reached the end of its service life or requires upgrades to meet current regulatory standards. T…

Key facts

Buyer
Toowoomba Regional Council
Location
153 Herries St, Toowoomba City, QLD 4350, Australia
Status
Closed
Opened
12 Mar 2026
Closed
15 Apr 2026
Decision
27 May 2026
Categories
ELEC, Lighting, Equip & Services, Water & Sewage

Summary and scope

The Wetalla Water Reclamation Facility which treats wastewater generated by Toowoomba and surrounding regional towns needs a functioning and sustainable treatment process to produce an environmentally safe effluent product for reuse or discharge as appropriate.The individual parts that support this treatment process include a Preliminary Treatment Area, Reactor Tank Process, Clarification, Disinfection, Return Activated Sludge, Aerobic Digestion, Sludge Handling and Effluent Re-use and Discharge.Each of these processes are supported by large mechanical plant that are powered through one of two main switchboards; Main Switchboard (MSB) – A and MSB-B. These main switchboards in turn feed smaller Motor Control Centres (MCCs) including the Disinfection MCC, AWTP MCC and Biosolids MCC. MSB-A is fed by a 11kV/415V transformer which is located outside Switch room A and MSB-B is fed by a 11kV/415V transformer which is located outside Switch room B. These two transformers are fed from a TRC owned 11kV RMU.Some of the critical electrical assets supporting the Wetalla Water Reclamation Facility have reached the end of their service life, are exhibiting signs of deterioration, or no longer comply with current regulatory standards—necessitating intervention.Due to the complex interdependencies between systems, compatibility requirements, operational site constraints, and the need for cost-effective delivery, a holistic project-based approach is essential in addressing asset renewals that prioritises strong coordination and risk mitigation.

Source and freshness

Open buyer portal ↗

Source update date not provided

Information shown is sourced from public opportunity records.