2526-28 DBS - Substructure Upgrade and Timber Flooring Replacement (Courts 4-7)

Location: 225 Lonsdale St, Dandenong, VIC 3175, Australia

Buyer: City of Greater Dandenong

Opened: Apr 15, 2026

Closing: May 06, 2026

Building Products & MaterialsBuilding Trade, Repairs, Maint.Construction & Operation
### ๐Ÿ—๏ธ Project Overview Greater Dandenong City Council is inviting tenders for the **Substructure Upgrade and Timber Flooring Replacement** at the Dandenong Basketball Stadium (DBS), specifically targeting Courts 4-7. This project aims to modernize the facility's aging infrastructure, which has not undergone a full flooring replacement since the stadium's construction in 1992. ### ๐Ÿ› ๏ธ Scope of Work The successful contractor will be responsible for: * **Demolition & Removal:** Careful removal of existing timber decking and identified joists. * **Structural Upgrades:** Rectification works under the sub-floor, including bearer stiffening and installation of new joists per structural drawings. * **Installation:** Laying new timber decking, installing new timber skirting, and fitting new volleyball floor sockets and electrical floor boxes. * **Finishing:** Applying floor polish per manufacturer requirements and completing court line marking. * **Restoration:** Reinstating court infrastructure and loose furniture to match existing conditions. ### ๐Ÿ“‹ Key Requirements * **Compliance:** All work must adhere to structural designs compliant with AS1170.1. * **Experience:** Bidders must demonstrate relevant experience in large-scale sports flooring and structural carpentry. * **Capacity:** The project requires a strict adherence to the construction timeline (1 September 2026 โ€“ 24 December 2026). * **Sustainability:** Bidders must provide a detailed disposal/recycling plan for removed timber and specify the sourcing/processing of new materials. ### ๐Ÿ“ Location & Logistics * **Site:** Dandenong Basketball Stadium, 270 Stud Rd, Dandenong, VIC. * **Access:** 7-day work week access is permitted. Storage is limited to the contractor's site compound or the immediate work area. **Keywords:** #SportsFlooring #ConstructionTender #DandenongCouncil #TimberFlooring #StructuralUpgrade #BuildingMaintenance #BasketballStadium