Bridge Replacement - Hollonds O'Briens Road, Swifts Creek

Location: 273 Main St, Bairnsdale, VIC 3875, Australia

Buyer: East Gippsland Shire Council

Opened: Apr 22, 2026

Closing: May 20, 2026

Construction & Operation
### πŸ—οΈ Tender Overview: Bridge Replacement at Swifts Creek The **East Gippsland Shire Council** is inviting tenders for the construction of a new two-span bridge over the Tambo River at Hollonds O'Briens Road, Swifts Creek. This infrastructure project is critical for local connectivity and requires a contractor with proven expertise in civil engineering and bridge construction. ### πŸ“‹ Key Requirements & Scope - **Project Scope:** Complete construction of a new two-span bridge, adhering to all provided contract specifications and technical drawings. - **Prequalification:** Tenderers must hold **VicRoads (Department of Transport and Planning) Level B1 prequalification** (or an equivalent national standard, such as the National Prequalification System for Civil Construction) at the time of tender closing. - **Documentation:** Bidders must submit comprehensive response schedules, including pricing, HSW prequalification, insurance policies, and management plans (OHS, Quality, Environmental, and Construction). ### πŸ“ Location & Timeline - **Location:** Swifts Creek, Victoria. - **Submission Deadline:** May 20, 2026, at 2:00 PM (AEST). - **Decision Date:** Expected by July 19, 2026. ### πŸ” Search Keywords Bridge construction, civil engineering, infrastructure, East Gippsland, road and bridge maintenance, VicRoads B1 prequalification, Tambo River, public works, council tender.