Victoria Park Pump Station Water Main Cut In and Pipe Install

Location: 437 Peel St, Tamworth, New South Wales 2340, Australia

Buyer: Tamworth Regional Council

Opened: Apr 24, 2026

Closing: May 14, 2026

Construction & OperationWater & Sewage
### 🏗️ Tender Overview: Victoria Park Pump Station Infrastructure Tamworth Regional Council is inviting proposals for the **Victoria Park Pump Station Water Main Cut In and Pipe Installation** project. This critical infrastructure upgrade aims to mitigate risks associated with the existing rising main to the Oxley Park Reservoir, which currently serves as a single point of failure for East Tamworth's water supply. #### 📋 Scope of Work Successful bidders will be responsible for: * **Excavation:** Site works surrounding Victoria Park Pump Station 1. * **Installation:** Laying of 150mm Ductile Iron Cement Lined (DICL) piping. * **Connection:** Integrating the new pipework to the pump station to ensure reliable pressurized water delivery. *Note: The Council will supply all major pipework, flanged components, and stop valves.* #### 🛠️ Requirements & Qualifications * Proven experience in installing **Ductile Iron and flanged 150mm water mains**. * Experience with **live cut-ins** is highly preferred but not mandatory. * Mandatory site visit scheduled for **Wednesday, 6th May 2026, at 9:00 AM** at the Victoria Park Reservoir, Piper St, Tamworth. #### 📍 Location & Contact * **Issuing Authority:** Tamworth Regional Council, NSW. * **Contact:** Ben Sharpham, Water Engineer. This opportunity is ideal for specialized civil engineering and plumbing contractors with expertise in municipal water infrastructure and pipeline construction. Interested parties should ensure their submissions align with the technical specifications provided in the tender documentation.