AUSTRALIA · TENDER
Epoxy floor Repairs of all MSAC Plant Rooms (17 Nos.)
🏢 Tender Overview: Epoxy Floor Repairs at MSAC The State Sport Centres Trust (SSCT) is inviting tenders for the professional preparation and application of non-slip epoxy floor coatings across 17 plantroom locations at the Melbourne Sports and Aquatics Centre (MSAC). 🛠Scope of Work Successful contractors will be responsible for: Surface Preparation: Remed…
Key facts
- Buyer
- State Sport Centres Trust
- Location
- 30 Aughtie Dr, Albert Park, VIC 3206, Australia
- Status
- Closed
- Opened
- 13 May 2026
- Closed
- 09 Jun 2026
- Decision
- 21 Jul 2026
- Categories
- Building Trade, Repairs, Maint.
Summary and scope
Preparation and Epoxy + Anti Trip treatment for 17 Plantroom locations withing Melbourne Sport and Aquatics CentreMSAC has many plantrooms used for a variety of different reasons. These range from our Pool Plantrooms, Mechanical Plantrooms and Air Handling Unit (AHU) Plantrooms. These plantrooms are harsh environments with fluctuating exposure to moisture and chemicals. Over time the concrete floors have deteriorated making them a slipping hazard, hard to move loads around and difficult to clean. Non-slip epoxy coatings have been recommended for concrete surfaces to enhance safety, durability, create a protective barrier against damage, ease to clean and improve aesthetics. Currently only the Stage 1 and Stage 2 Pool Plantrooms have had an application of non-slip epoxy. This was applied in 2018, making the area overdue for a re-application. The remaining plantroom floor surfaces are all unsealed concrete, therefore are very susceptible to corrosion and concrete damage. 4. Project RequirementsUsing the attached Dulux DuSpec+ Specification as a guide, undertake application of Non-Slip Epoxy coating to the following areas:• Stage 1 Pool Plantroom • Stage 2 Pool Plantroom• AHU 1-2 & 1-7 • AHU 1-1 & 1-6• AHU 1-3 • AHU 1-3 Surrounding Area• Stairs to AHU 1-3• Sprinkler Room• Chiller Plantroom• Boiler Plantroom• Co-Gen Plantroom• Plantroom Hallway• AHU 1-4 & 1-5• AHU 2• AHU 2 Return Void• CR-1 Plantroom• Loading Bay5. Program & Methodology • Contractor must prepare a step-by-step program of works and provide detailed methodology of each step for approval. • Products used to prep the area must be solvent free• The methodology must take into consideration, the operational impacts with plans to minimize the operational impacts.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records.