AUSTRALIA · TENDER

Expansion of Bamaga Sewer Ponds

The Northern Peninsula Area Regional Council (NPARC) is inviting proposals for the expansion of the Bamaga Sewer Treatment Ponds. This is a design and construct project aimed at increasing the plant's capacity to 6,000 Equivalent Persons (EP). The scope of work includes enlarging two primary lagoons, adding a third secondary lagoon, installing new interconne…

Decide whether this tender fits your team

Your team keeps the bid/no-bid decision.

Request a bid/no-bid review · Search related open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Northern Peninsula Area Regional Council
Buyer address
6 Charlie St, Umagico, QLD 4876, Australia
Status
Open
Opened
19 Aug 2026
Closing
15 Oct 2026
Decision
28 Oct 2026
Categories
Construction & Operation

Summary and scope

The Northern Peninsular Area Regional Council is seeking proposals from suitably qualified and experienced contractors to carry out works to expand the capacity of the Sewer Treatment Ponds in Bamaga. Concept designs are attached. NPARC will accept variation to these designs. The work involves the increase in size of the 2 primary lagoons and the addition of a 3rd secondary lagoon.Other works include: New interconnecting pipework and valves; new bypass pipelines, relocation of a rising main, relocation of electrical wires, fencing and landscaping works.The current STP must be able to operate for as long as possible during the construction works.In addition, the contractor will provide an improved screening and grit removal system at the inlet to the STP. The design and type of these systems has not been specified and therefore the Contractor can propose the most cost effective system, with a focus on total life-cycle costs.There is some desludging work required in the existing ponds. That work can be delivered as a variation, using unit rates.