AUSTRALIA · TENDER
Tender 10-27 Design and Construct Boardwalk Jeffery Court, Agnes Water
Tender 10-27 Design and Construct Boardwalk Jeffery Court, Agnes Water Gladstone Regional Council is seeking tenders from qualified contractors for the design and construction of a fibre-reinforced polymer (FRP) boardwalk at Jeffery Court, Agnes Water. This project requires a comprehensive approach to infrastructure development, including engineering certifi…
Decide whether this tender fits your team
Your team keeps the bid/no-bid decision.
Request a bid/no-bid review · Search related open tenders
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Gladstone Regional Council
- Buyer address
- 113 Goondoon St, Gladstone Central, QLD 4680, Australia
- Status
- Open
- Opened
- 25 Sept 2026
- Closing
- 27 Oct 2026
- Decision
- 07 Dec 2026
- Categories
- Building Trade, Repairs, Maint., Construction & Operation, Engineer, Research, Tech services
Summary and scope
Gladstone Regional Council (GRC) requires a suitably qualified Contractor to undertake the Design and Construct of an Australian-manufactured fibre-reinforced polymer (FRP) Boardwalk located along Jeffery Court, Agnes Water. The boardwalk is to be approximately 90m in length with a width varying between 2.8 - 3.2m, including handrail sections (as required) as detailed in this scope of work. The design shall insure that static electricity buildup across the boardwalk and load bearing members and foundation is adequately addressed. The contractor is responsible for the full design, RPEQ engineering certification, construction, site supervision and provision of as constructed drawings upon completion. 'The boardwalk must be designed and built to retain the existing trees, including avoiding damage to the trunks, roots and critical root zones as defined throughout this document. The project also includes the design and installation of xeric (low-water, drought tolerant) coastal landscaping to enhance amenity and provide a low maintenance interface around the boardwalk. The landscaping must be designed to thrive without irrigation. As an alternative offer, the Contractor may provide a price for the Design and Construct of the new boardwalk utilising alternative composite materials (such as APR). Where such an alternative offer is presented, the contractor shall ensure that static electricity buildup across the boardwalk surface and load bearing members and foundation is adequately addressed.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.