AUSTRALIA · TENDER

Emerald Sporting Fields Top Dressing

Emerald Sporting Fields Top Dressing Central Highlands Regional Council is seeking quotations from suitably qualified contractors to perform sports field renovation works, specifically aeration, coring, and top dressing, at various sporting fields in Emerald, Queensland. This project aims to improve turf health, soil structure, and drainage to ensure safe an…

Decide whether this tender fits your team

Your team keeps the bid/no-bid decision.

Request a bid/no-bid review · Search related open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Central Highlands Regional Council
Buyer address
65 Egerton St, Emerald, QLD 4720, Australia
Status
Open
Opened
03 Nov 2026
Closing
20 Nov 2026
Decision
22 Nov 2026
Categories
Building Products & Materials, Horticulture & Arboriculture, Plant & Equipment - Hire

Summary and scope

Central Highlands Regional Council is seeking quotations from suitably qualified contractors to undertake sports field renovation works at nominated sporting fields within Emerald.The works are intended to improve turf health, alleviate soil compaction, enhance drainage, improve playing surface quality, and support the long-term sustainability and safe use of community sporting facilities.The successful contractor shall provide all labour, plant, equipment, materials and supervision necessary to undertake the following:• Hollow Tine Aeration (Coring) to relieve soil compaction and improve root zone performance. (All fields except McIndoe Field#3) • Collection, processing and management of extracted cores where required. • Supply and application of approved top dressing material. Central Highlands Regional Council is seeking quotations from suitably qualified contractors to undertake sports field renovation works at nominated sporting fields within Emerald.The works are intended to improve turf health, alleviate soil compaction, enhance drainage, improve playing surface quality, and support the long-term sustainability and safe use of community sporting facilities.The successful contractor shall provide all labour, plant, equipment, materials and supervision necessary to undertake the following:• Hollow Tine Aeration (Coring) to relieve soil compaction and improve root zone performance. (All fields except McIndoe Field#3) • Collection, processing and management of extracted cores where required. • Supply and application of approved top dressing material. • Mechanical spreading and incorporation of top dressing to achieve a uniform surface finish of at least 10mm • Drag matting, brushing or similar finishing techniques to ensure even distribution of material. • Protection of existing turf, irrigation systems, drainage infrastructure and surrounding assets. • Removal and lawful disposal of waste materials generated during the works. • Site clean-up and reinstatement upon completion. Topdressing material shall consist of a clean, washed, free-draining medium-coarse sand suitable for sports turf applications. The sand shall be free from clay, organic matter, weed seed, stones greater than 5 mm, and other materials. The Contractor shall nominate the proposed sand source and provide particle size distribution data upon request. The Contractor shall mechanically spread and incorporate topdressing material in incremental passes and shall not apply the full depth in a single pass. The material shall be distributed evenly across the nominated playing surface to achieve an average finished topdressing depth of 10 mm. Following each application pass, drag matting, brushing, levelling or other approved finishing methods shall be undertaken to ensure even distribution and incorporation of the material. Any low areas, depressions, hollows, birdbaths, surface undulations or other irregularities identified during the works shall be filled and levelled as required using additional topdressing material. Hand placement and finishing shall be undertaken where necessary to achieve a smooth, uniform playing surface and eliminate localised variations in surface level. Upon completion, the surface shall be free of ridges, windrows, excessive accumulations of material and abrupt level changes, and shall maintain positive surface drainage suitable for sports field use. The Contractor is responsible for undertaking works in accordance with industry best practice, relevant workplace health and safety legislation, and manufacturer recommendations for all equipment used. Works must be completed in a manner that minimises disruption to sporting clubs and facility users while maintaining safe access to surrounding areas. Any damage caused to Council assets during the works shall be rectified by the Contractor at no cost to Council. Upon completion, the Contractor shall provide confirmation of: • Areas treated. • Aeration and coring methodology utilised. • Quantity and specification of top dressing material applied. • Any defects, irrigation faults or field condition issues identified during the works. The completed surface must provide an even, safe and high-quality playing area suitable for community and competitive sporting use.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.