AUSTRALIA · TENDER
112-24 Re-Tiling 50M Pool at Gladstone Aquatic Centre
GRC requires a suitably qualified Contractor to complete a Design and Installation Works required for the re-tiling of the existing 50m commercial pool which forms part of the Gladstone Aquatic Centre (GAC). The GAC is a significant GRC asset and is used by the Gladstone community daily. The original 50m Memorial Swimming Centre was constructed in circa 1975…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Gladstone Regional Council
- Buyer address
- 113 Goondoon St, Gladstone Central, Queensland 4680, Australia
- Status
- Closed
- Opened
- 01 Mar 2024
- Closed
- 04 Apr 2024
- Decision
- 01 May 2024
- Categories
- Building Trade, Repairs, Maint., Construction & Operation
Summary and scope
GRC requires a suitably qualified Contractor to complete a Design and Installation Works required for the re-tiling of the existing 50m commercial pool which forms part of the Gladstone Aquatic Centre (GAC). The GAC is a significant GRC asset and is used by the Gladstone community daily. The original 50m Memorial Swimming Centre was constructed in circa 1975, followed by the addition of a Multi-Purpose Pool (i.e. 25m indoor pool) and building extension in 1988 and 1998 respectively. The facility has high usage and is utilised by a wide range of user groups, including Age Care groups, Physiotherapists, Learn to Swim groups, and Swim Clubs just to name a few. GAC hosts several assets including a 50m outdoor pool, a 25m heated indoor pool, and Aquatic Play Park.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.