AUSTRALIA · TENDER

112-24 Re-Tiling 50M Pool at Gladstone Aquatic Centre

GRC requires a suitably qualified Contractor to complete a Design and Installation Works required for the re-tiling of the existing 50m commercial pool which forms part of the Gladstone Aquatic Centre (GAC). The GAC is a significant GRC asset and is used by the Gladstone community daily. The original 50m Memorial Swimming Centre was constructed in circa 1975…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Gladstone Regional Council
Buyer address
113 Goondoon St, Gladstone Central, Queensland 4680, Australia
Status
Closed
Opened
01 Mar 2024
Closed
04 Apr 2024
Decision
01 May 2024
Categories
Building Trade, Repairs, Maint., Construction & Operation

Summary and scope

GRC requires a suitably qualified Contractor to complete a Design and Installation Works required for the re-tiling of the existing 50m commercial pool which forms part of the Gladstone Aquatic Centre (GAC). The GAC is a significant GRC asset and is used by the Gladstone community daily. The original 50m Memorial Swimming Centre was constructed in circa 1975, followed by the addition of a Multi-Purpose Pool (i.e. 25m indoor pool) and building extension in 1988 and 1998 respectively. The facility has high usage and is utilised by a wide range of user groups, including Age Care groups, Physiotherapists, Learn to Swim groups, and Swim Clubs just to name a few. GAC hosts several assets including a 50m outdoor pool, a 25m heated indoor pool, and Aquatic Play Park.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.