AUSTRALIA · TENDER
St Crispins Avenue Port Douglas New Concrete Footpath
Council is seeking a suitable Contractor to undertake construction of clearing works, roofwater lines, new approximately 240m by 1.8m width concrete footpaths and turfing as identified in the provided drawings and scope details of this tender request. Notice to Tenderers No NTT-01 Following Tenderer Site Inspection held Thursday, 27th June, Council advises t…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Douglas Shire Council
- Buyer address
- 64 Front St, Mossman, Queensland 4873, Australia
- Status
- Closed
- Opened
- 16 Jun 2024
- Closed
- 15 Jul 2024
- Decision
- 25 Aug 2024
- Categories
- Building Trade, Repairs, Maint.
Summary and scope
Council is seeking a suitable Contractor to undertake construction of clearing works, roofwater lines, new approximately 240m by 1.8m width concrete footpaths and turfing as identified in the provided drawings and scope details of this tender request. Notice to Tenderers No NTT-01 Following Tenderer Site Inspection held Thursday, 27th June, Council advises that: The heavy vegetation on the footpath fronting No 110 St Crispins Avenue has been cleared but significant stumps remain to about 200mm above ground level. Council will remove same. In relation to Clearing generally (Price Schedule Item No 2.01), Council advises that Council will carry out the bulk clearing of the large trees and shrubs on the footpath area including grinding down the stumps to min 150mm below the proposed new concrete path. (This work is deleted from the Contractor’s Scope of Works). Council will also arrange disposal of the resulting debris and bulk shaping of the footpath where necessary (No 110). The Contractor shall still be responsible for: • Obtain BYDA services locations and Council as-constructed services as relevant (for their general construction risk management) – Item 1.09 • Carry out potholing where the Contractor Works risk clashing with services Item 1.09 • Detailed clearing (eg strip turf, minor vegetation) – Item 2.01, and detailed reinstatement (including tidy of residents garden beds along the property boundary line) and turfing • Detailed shaping and trimming of the footpath to suit the profile for the new concrete footpath. Tenderers should Request if they require an extension to the Closing Date to price the these changes to scope.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.