AUSTRALIA · TENDER

Supply of potable water

Project: Central-West Orana Renewable Energy Zone (REZ) - Transmission Project Project owner: ZINFRA PTY LTD Location: NSW Australia Work package status: Closed Scope: Full Scope Work package description: Local provider for potable drinking water to supply site water tanks. This will be done 1 or 2 two times a month. Provider will need to come to site to pro…

Key facts

Buyer
ZINFRA PTY LTD
Location
NSW Australia
Status
Closed
Opened
22 Mar 2026
Closed
05 Apr 2026
Decision
Not provided
Categories
Full Scope

Summary and scope

Project: Central-West Orana Renewable Energy Zone (REZ) - Transmission Project Project owner: ZINFRA PTY LTD Location: NSW Australia Work package status: Closed Scope: Full Scope Work package description: Local provider for potable drinking water to supply site water tanks. This will be done 1 or 2 two times a month. Provider will need to come to site to provide the water. They will require full PPE as these will be on construction sites. SP2 - Wollar SP3 and SP4 - Bayswater SP5 - Wallerawang Greenspot SP6 - Wallerawang Substation SP6 - Mt Piper Substation The same person could provide service for SP5 and SP6. Project overview: The Central-West Orana Renewable Energy Zone (REZ) Transmission Project will build new high-capacity transmission lines, energy hubs and supporting infrastructure to transfer power generated by solar and wind projects to electricity consumers. The new infrastructure is expected to be operational by 2028 and will initially unlock up to 4.5 gigawatts of new network capacity.The project consists of 90km of 500kV overhead transmission lines and 150 km of 330kV transmission lines for generator connections, stretching from Elong Elong in the west through to Barigan Creek in the east, via an energy hub at Merotherie.The Scope of works consists of 6 Separable Portions:Separable Portion 1 (SP1): Detailed Design, LLE procurement and management plans i.e., all works required to be 'Construction Ready'.Separable Portion (SP2): 500kV Barigan Creek Switching Station Cut-In (incl works at Wollar Substation, Bayswater Substation and Mt Piper Substation)Separable Portion (SP3): 330kV Transmission Line Bayswater and LiddellSeparable Portion 4 (SP4): Substation Works Bayswater and LiddellSeparable Portion 5 (SP5): 330kV Transmission Line Mt Piper and WallerawangSeparable Portion 6 (SP6): Substation Works Mt Piper and WallerawangSubstation Scope Summary:4 Substations where a new bay is to be installed replacing an old existing bay with upgrades to secondary systems.Total of 6 Substations where Remote End Works is required for these upgrade works.Transmission Line Scope Summary:500kV Transmission Line Cut-In works into the Barigan Creek Switching Station.2 x 330kV Transmission Lines upgrades between Bayswater to Liddell and Mt Piper to Wallerawang.These upgrades are additional circuits to one line and modifications to the tower lines based on location of new bay locations in the Substations.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records.