AUSTRALIA · TENDER

Stormwater (SW) Ōtākaro Avon River Corridor Stopbank Anzac Drive to Waitaki Street (OARC)

Stormwater (SW) Ōtākaro Avon River Corridor Stopbank Anzac Drive to Waitaki Street (OARC) Christchurch City Council is inviting tenders for the construction of flood protection and stormwater infrastructure within the Ōtākaro Avon River Corridor. This project involves significant civil engineering works, including the construction of floodwalls, pump station…

Decide whether this tender fits your team

Your team keeps the bid/no-bid decision.

Request a bid/no-bid review · Search related open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Christchurch City Council
Buyer address
Christchurch, Canterbury
Status
Open
Opened
05 Oct 2026
Closing
25 Nov 2026
Categories
30120000 - Roads and landscape, 72103300 - Infrastructure maintenance and repair services, 72120000 - Nonresidential building construction services, 72140000 - Heavy construction services

Summary and scope

The Works for this RFT shall include, but are not limited to: SP1 – Anzac to Waitaki Flood Protection: • Sheet‑pile floodwall and embankments – installation of STU2700 sheet piles, core material tie‑ins, toe drains, earth embankments on both sides, and safety barrier along Anzac Drive. • Stormwater and groundwater infrastructure – new gravity reticulation, swales, debris screen structure, stormwater pump station (3 × 0.5 m³/s pumps), northern groundwater pump station, rising mains, distribution chamber, and river outfall works. • Roading upgrades – full reconstruction and raising of Wainoni Road to RL 2.92 m, new shared paths/cycle lanes, sump adjustments, and service relocations. • City to Sea Pathway and access works – 4 m‑wide asphalt pathway on embankment, access tracks, small culvert installations, and tie‑ins to existing routes including Falconwood Grove. • Landscaping and siteworks – ecological planting, reserve works (incl. Jack Hinton Memorial relocation), architectural electrical building, fencing, contaminated soil handling, earthworks, and site reinstatement. SP2 – Waitaki Treatment Facility: • Construction of a stormwater first flush basin that will provide storage and treatment of first flush volume runoff from the adjacent urban catchments. • Construction of twin stormwater treatment wetlands which, in addition to treating stormwater, will provide ecological benefit by providing habitat for birds and other wildlife. • Construction of the final length of the upstream piped connection with associated manholes. • Abandonment of remaining stormwater and wastewater pipes that are in Bexley Road and removal of almost all services that are below the formation level of the stormwater management facility.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.