P26-184 Urenui Suspension Bridge Replacement - Design & Build Services EOI
Location: Taranaki
Buyer: New Plymouth District Council
Opened: Jun 02, 2026
Closing: Jul 01, 2026
30000000 - Structures and Building and Construction and Manufacturing Components and Supplies72120000 - Nonresidential building construction services72140000 - Heavy construction services
🌉 Project Overview The New Plymouth District Council (NPDC) is seeking expressions of interest (EOI) for the P26-184 Urenui Suspension Bridge Replacement. This project involves the design and construction of a new pedestrian suspension bridge to replace the existing Urenui Swing Bridge. The council is looking for a qualified design-and-build contractor capable of delivering a resilient, durable, and safe infrastructure solution. 🛠Key Requirements & Scope Design Life: Minimum 50-year design life. Resilience: Must withstand flooding, erosion, and climate-change impacts. Environment: Proven experience in marine and coastal environments is essential, including ecological impact mitigation for local flora and fauna. Cultural Alignment: The project must be developed in collaboration with Ngati Mutunga (mana whenua) to ensure cultural appropriateness. Delivery Model: Integrated design-and-build services. 📋 Submission Details Platform: All documentation and submissions must be managed via the TenderLink portal. Registration: Interested parties must register on TenderLink to access RFx documents. Keywords: #BridgeConstruction #DesignAndBuild #CivilEngineering #Infrastructure #NewPlymouth #Taranaki #PedestrianBridge #NgatiMutunga #CoastalEngineering This opportunity is ideal for civil infrastructure firms with specialized expertise in suspension bridge engineering and sustainable, culturally-sensitive construction practices.