Embedded Piping Installation

Location: NSW Australia

Buyer: Voith Hydro GmbH & Co. KG

Opened: May 18, 2026

Closing: Jun 16, 2026

Full Scope
🏗️ Project Overview: Snowy 2.0 Embedded Piping Installation Voith Hydro GmbH & Co. KG is seeking qualified contractors for the Embedded Piping Installation work package (Tender ID: icnwp139865) as part of the landmark Snowy 2.0 pumped storage project in New South Wales, Australia. This critical infrastructure development connects the Tantangara and Talbingo Dams, featuring an underground power station equipped with six reversible Francis-type pump turbines, each with a 333 MW capacity. 📋 Scope of Work & Requirements This tender covers the full scope of embedded piping installation required for the power station's auxiliary systems. Successful bidders will be expected to demonstrate: Technical Expertise: Proven capability in large-scale industrial piping installation within underground or hydroelectric environments. Project Alignment: Ability to work within the established project timeline, which extends through 2026. Compliance: Adherence to the rigorous safety and quality standards mandated by Voith Hydro and the Future Generation Joint Venture (Salini Impregilo, Clough, and Lane). 🌍 Project Significance Snowy 2.0 is a cornerstone of Australia's renewable energy transition, providing 2,000 MW of generation capacity and 175 hours of large-scale energy storage. By participating in this work package, contractors contribute to a project vital for grid stabilization and the expansion of sustainable power generation. 📅 Key Information Issuing Organization: Voith Hydro GmbH & Co. KG Location: NSW, Australia Submission Deadline: 2026-06-16T14:00:00Z Keywords: #Snowy2.0 #HydroPower #PipingInstallation #Infrastructure #RenewableEnergy #VoithHydro #ConstructionTender #NSWProjects