Exposed Piping Installation

Location: NSW Australia

Buyer: Voith Hydro GmbH & Co. KG

Opened: May 18, 2026

Closing: Jun 16, 2026

Full Scope
๐Ÿ—๏ธ Project Overview: Snowy 2.0 Pumped Storage Station Voith Hydro GmbH & Co. KG is seeking experienced contractors for the Exposed Piping Installation work package (Tender ID: icnwp139898) as part of the landmark Snowy 2.0 project in New South Wales, Australia. This critical infrastructure initiative involves connecting the Tantangara and Talbingo Dams via underground tunnels and a high-capacity power station. ๐Ÿ“‹ Scope of Work & Requirements Project Scope: The successful bidder will be responsible for the installation of exposed piping systems. Detailed technical specifications are provided in the attached scoping document within the ICN Gateway portal. Project Context: Snowy 2.0 is a 2,000-megawatt pumped storage facility designed to provide 175 hours of continuous large-scale energy storage. The facility utilizes six reversible Francis-type pump turbines to support grid stabilization and renewable energy integration. Contractor Expectations: Bidders should demonstrate technical proficiency in industrial piping installation within large-scale hydropower or heavy industrial environments. ๐Ÿข About the Buyer Voith Hydro, a division of the global Voith Group, is the lead technology partner for the Snowy 2.0 project, responsible for the supply of pump turbines, motor generators, auxiliary systems, and power plant automation. ๐Ÿ“… Key Information Location: NSW, Australia Submission Deadline: 2026-06-16T14:00:00Z Tender Portal: ICN Gateway - Snowy 2.0 Keywords: Exposed Piping, Piping Installation, Hydropower Construction, Snowy 2.0, Voith Hydro, Industrial Piping, Renewable Energy Infrastructure, NSW Construction Tenders.