AUSTRALIA · TENDER

Concrete Supply, Formwork Placement and Pumping

Concrete Supply, Formwork Placement and Pumping The Toowoomba Regional Council is inviting expressions of interest from qualified subcontractors for the Southern Water Treatment Plant (SWTP) Project located in Toowoomba, QLD. This major infrastructure initiative, jointly funded by the Queensland Government and the Council, aims to enhance regional water secu…

Decide whether this tender fits your team

Your team keeps the bid/no-bid decision.

Request a bid/no-bid review · Search related open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Toowoomba Regional Council
Buyer address
QLD Australia
Status
Open
Opened
08 Oct 2026
Closing
09 Oct 2027
Categories
Full Scope

Summary and scope

Project: Southern Water Treatment Plant Project Project owner: Toowoomba Regional Council Location: QLD Australia Work package status: Open Scope: Full Scope Work package description: Toowoomba Regional Council (Council) invites suitably qualified and experienced concrete suppliers, concrete contractors, formwork suppliers and contractors, pumping providers and ground improvement specialists to register their interest in potential subcontracting opportunities associated with the Southern Water Treatment Plant Project (SWTP). These works packages are anticipated to be procured and managed by the appointed main contractor as part of the broader delivery of the Project. The concrete works are likely to include the supply, delivery, pumping, placement and finishing of concrete for water-retaining structures, treatment process structures, reservoirs, pump stations, equipment foundations, buildings, accessways and other associated civil infrastructure. The scope may include concrete mix design and verification, concrete supply, reinforcement supply, reinforcement fixing, construction joints (including waterstops), placement, curing, surface finishing, testing. The formwork scope may include conventional, modular and proprietary formwork systems; falsework, propping and access systems. Scope may include formwork design, inspections and certification. Particular experience delivering complex and watertight reinforced-concrete structures for water infrastructure would be advantageous. Ground improvement works may ground stabilisation, grouting, piling or other foundation improvement techniques required to achieve the specified bearing capacity, settlement and structural performance. Contractors may also be required to support the main contractor in ground improvement design. Project overview: Overview Toowoomba Regional Council (Council) is planning the delivery of a new water treatment plant (Southern Water Treatment Plant Project) to meet growing regional demand and enhance the security and resilience of the region's potable water supply. The new Toowoomba to Warwick Pipeline provides an opportunity for Council to access an additional raw water source in the south-western Toowoomba Region. Integrating a new potable water supply asset into Council's network would increase treatment capacity, reduce reliance on the existing Mt Kynoch Water Treatment Plant and support the region's future growth and long-term water security. The Project is expected to comprise: a new water treatment plant with a nominal capacity of 25 ML/day, with provision for future expansion up to 50ML/day, together with associated distribution infrastructure; approximately 14.7 km of trunk water mains; a pipeline from SWTP to Mt Peel Reservoir; a Drayton Booster Pump Station; a water storage reservoir near Mount Peel Bushland Reserve; and a raw-water offtake from the Toowoomba to Warwick Pipeline. The Project will be jointly funded by the Queensland Government and Council and designed to be delivered as a single, integrated package of works by the successful D&C Contractor. Delivery Schedule The Project is currently going through a competitive two-stage procurement process that will be used to select a suitability qualified contractor for the Project. It is forecast that the Preferred Contractor will be appointed in early March 2027. Early Works are scheduled to commence on site Q3 2027, with the forecast date for completion between Q2-Q3 2029. Expression of Interest Council invites local and regional businesses interested in supplying goods, services or works to the Project to register an Expression of Interest (EOI) through this ICN Gateway Project page. Council is committed to supporting local suppliers, strengthening industry capability and maximising local participation, with particular emphasis on businesses and workers located within Council's Local Government Area (LGA). This EOI provides businesses with an opportunity to outline their capabilities and be considered for potential supply and subcontracting opportunities associated with the Project. Specific supply and work package opportunities will be published on this page as they become available. Interested businesses should: ensure their ICN Gateway company profile is complete, current and accurate; enable email notifications for relevant supply opportunities; register their interest against applicable opportunities as a full or partial scope supplier, where relevant; and respond fully to all Project-specific and work package-specific questions. Information submitted through ICN Gateway will be made available to shortlisted head contractors during the Early Contractor Involvement (ECI) Phase. This will assist prospective head contractors to identify capable suppliers, establish effective supply chains and develop strategies that maximise local and regional industry participation. Registration of an expression of interest does not guarantee engagement, inclusion in the Project supply chain or progression to a subsequent procurement stage. Businesses that demonstrate the capability and capacity to meet relevant work package and prequalification requirements may be invited to participate in future procurement or Request for Tender processes.

Source and freshness

Source data updated 08 Nov 2026