Accommodation Expansion and Accommodation Modules

BHP Oak Dam Accommodation Expansion and Modules BHP Olympic Dam Corporation Pty Ltd is seeking expressions of interest for the design, fabrication, and installation of accommodation infrastructure at the Oak Dam site in South Australia. This project supports the broader Oak Dam Underground Access Project, which aims to facilitate deep exploration drilling of…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
BHP OLYMPIC DAM CORPORATION PTY LTD
Buyer address
Oak Dam, SA
Status
Closed
Opened
07 May 2024
Closed
20 May 2024
Categories
Construction, Mining Infrastructure, Accommodation, Engineering Design, Logistics and Transport

Summary and scope

BHP Olympic Dam (BHP) is a fully-integrated mining and mineral processing operation, owned by the BHP Group through its wholly owned subsidiary BHP Olympic Dam Corporation Pty Ltd.Oak Dam is a deep iron oxide copper-gold mineralised system located approximately 65 km south-east of Olympic Dam. BHP is currently completing exploration drilling from the surface to continue definition of the grade, geometry and continuity of the mineralisation. BHP is studying the option for early underground access which would support underground exploration drilling of the ore body.The Oak Dam Underground Access Project (Project) scope is to construct a twin decline to access the mineral deposit ~700m below ground level. The Project will be executed over three stages: Bulk Earthworks including box cut construction; Non-Process Infrastructure (NPI) providing surface infrastructure and installation, and Decline Development Operations (Mining).These three project stages represent the major Works Packages that will be released via the ICN Gateway.