AUSTRALIA · TENDER

4WD Training

Project: Central Queensland Transmission Projects Project owner: POWERLINK QUEENSLAND Location: QLD Australia Work package status: Closed Scope: Full Scope Work package description: Needs Assessment and Planning: Conduct an assessment of the workforces current driving skills and experience. Identify specific training requirements based on Program needs and t…

Key facts

Buyer
POWERLINK QUEENSLAND
Location
QLD Australia
Status
Closed
Opened
06 Apr 2026
Closed
18 May 2026
Decision
Not provided
Categories
Full Scope

Summary and scope

Project: Central Queensland Transmission Projects Project owner: POWERLINK QUEENSLAND Location: QLD Australia Work package status: Closed Scope: Full Scope Work package description: Needs Assessment and Planning: Conduct an assessment of the workforces current driving skills and experience. Identify specific training requirements based on Program needs and terrain conditions. Develop a comprehensive training plan outlining objectives and training modules. Vendor Selection and Contracting: Research and identify reputable 4WD training providers with experience in transmission line programs. Solicit bids or proposals from selected vendors and evaluate them based on expertise, training content, and cost. Contract with the chosen vendor for the delivery of the training program. Customisation of Training Collaborate with the chosen training provider to tailor the training content to the unique requirements of the transmission line Program. Ensure the training covers essential skills for driving site light vehicles in various terrains encountered along the transmission line route. Logistics and Scheduling Coordinate with the training provider to establish suitable training dates and locations. Arrange transportation and accommodation for participants attending the training sessions. Training Delivery Conduct classroom sessions covering theoretical aspects of 4WD operation, safety protocols, environmental considerations, and legal regulations. Organise hands-on practical sessions where participants can apply learned skills in real-world driving scenarios. Training to; RIIVEH201E & RIIVEH305F Terrain-specific Training Include modules focused on driving techniques for specific terrains encountered on the transmission line route (e.g., mud, sand, rocky areas). - Guide managing challenging conditions such as steep slopes and river crossings. Navigation and Route Planning Train participants in map reading, GPS usage, and compass navigation relevant to the transmission line Programs route. Emergency Preparedness Deliver training on responding to emergencies, including vehicle Project overview: Powerlink is delivering a portfolio of electricity transmission projects across Central Queensland to ensure the security of energy supply and the stability of the grid. This is a critical step in reinforcing the network, enabling the transition of power assets such as Gladstone Power Station with new energy sources while maintaining system strength and reliability.These projects are at varying stages of planning, assessment and delivery and will be implemented progressively, subject to regulatory approvals, investment decisions and funding processes.Powerlink is using a coordinated, program level approach across its Central Queensland projects to maximise opportunities for local and Indigenous businesses, while ensuring safe, efficient and reliable delivery of critical transmission infrastructure.Central Queensland Project PortfolioPowerlink's current Central Queensland project portfolio includes the following projects. Detailed and up to date information for each project, including scope, approvals and engagement activities, is available on Powerlink's website via the links below.Gladstone ProjectThe Gladstone Project is a multi-stage program of transmission upgrades to strengthen and increase capacity of the electricity network in the Gladstone region. This critical program of transmission upgrades will ensure the safety and reliability of the electricity network as the region prepares for the eventual retirement of the Gladstone Power Station, and heavy industry moves toward electrification of their operations increasing demand on the network.The Gladstone Project is being planned and delivered in stages, subject to regulatory approvals, funding decisions and the Queensland Government's Priority Transmission Investment (PTI) process.Stage 1 - Calvale to Calliope River Transmission Line ReinforcementStage 1 involves delivery of the Calvale to Calliope River Transmission Line Reinforcement Project, including a new transmission line and works at existing substations to improve network capacity and resilience.Calvale to Calliope River Transmission Line Reinforcement Project PowerlinkStage 2 - Bouldercombe to Larcom Creek ReinforcementStage 2 includes the Bouldercombe to Larcom Creek Reinforcement Project, which will further strengthen the transmission network servicing the Gladstone region and support forecast load growth.Bouldercombe to Larcom Creek Reinforcement Project PowerlinkTheodore Wind Farm Connection ProjectTransmission infrastructure to enable the connection of the Theodore Wind Farm to the Queensland electricity transmission network.Theodore Wind Farm Connection Project PowerlinkBanana Range Wind Farm Connection ProjectTransmission infrastructure to enable the connection of the Banana Range Wind Farm to the Queensland electricity transmission network.Banana Range Wind Farm Connection Project PowerlinkSystem Strength ProjectWith the increasing diversity of Queensland's power system, the System Strength Project will be critical to maintaining a strong and reliable supply of electricity well into the future.Powerlink will install four synchronous condensers at three substations in Central Queensland to stabilise and strengthen the power system.Under the National Electricity Rules, Powerlink is required to maintain system strength in Queensland's transmission network.The System Strength Project is being planned and delivered as a coordinated portfolio of works, subject to regulatory approvals, funding decisions and Final Investment Decision (FID).Works include:Nebo Synchronous CondenserInstallation of a synchronous condenser at Nebo Substation.Nebo Synchronous Condenser PowerlinkStanwell Synchronous CondenserInstallation of a synchronous condenser at Stanwell Substation.Stanwell Synchronous Condenser PowerlinkCalliope River Synchronous CondensersInstallation of two synchronous condensers at Calliope River Substation in Gladstone.Calliope River Synchronous Condensers PowerlinkSupplier Registrations of InterestPowerlink is seeking to understand the capability and capacity of suppliers interested in participating in Central Queensland transmission projects.Businesses are encouraged to register their interest through the Gateway by ICN, noting that registrations may relate to one or multiple projects within the Central Queensland portfolio.Suppliers who have already registered their interest for the Gladstone Project through the Gateway by ICN do not need to re-register. Existing registrations will be carried forward and considered as part of Powerlink's Central Queensland Supplier Register.Information collected through the Registration of Interest (ROI) process is used to:Inform market analysis and procurement planningSupport strategies to maximise local and Indigenous participationAssist principal contractors and Powerlink with identifying potential suppliers for upcoming work packagesHow Registrations of Interest Will Be UsedOnce a business has completed an Gateway by ICN registration, their details will form part of Powerlink's Central Queensland Supplier Register.This Register may be used by Powerlink and/or principal contractors to:Identify suppliers with relevant capability and experienceSeek additional information or clarificationInvite suppliers to participate in tendering or quotation processes for specific work packages as they become availableRegistration does not guarantee inclusion in future procurement activities.Local and Indigenous ParticipationPowerlink is committed to maximising opportunities for local and Indigenous businesses across its Central Queensland projects.A coordinated approach is being applied across projects to:Improve visibility of upcoming opportunitiesEncourage early engagement with capable local and Indigenous suppliersSupport meaningful participation aligned with project scope and supplier capabilitySupplier information provided through ICN will be used to inform participation strategies across relevant Central Queensland projects as opportunities arise.Assistance With ICN RegistrationsBusinesses seeking to participate in Powerlink's Central Queensland projects are required to register through the Industry Capability Network (ICN) Gateway. Registration enables Powerlink and its contractors to better understand supplier capability and capacity and supports market analysis and procurement planning across relevant projects.Suppliers requiring assistance with the Gateway by ICN platform can contact Powerlink's nominated ICN representative using the contact details provided alongside this listing.Supplier Information GuidePowerlink has developed a Supplier Information Guide to support businesses interested in participating in Central Queensland transmission projects. The guide provides general and introductory information to help suppliers understand the projects, how the Registration of Interest process works, and how supplier information may be used.The Supplier Information Guide is intended to assist businesses to position their capability information clearly and accurately and should be read alongside Gateway by ICN guidance material. The guide can be downloaded below.DisclaimerPowerlink reserves the right to utilise selective procurement processes and/or existing panels where technical, commercial or delivery requirements apply. By registering an Expression of Interest, suppliers acknowledge that:Registration does not guarantee participation in future procurement activitiesProject scopes, timing and delivery methods are subject to changePowerlink retains full discretion in all procurement decisionsDetailed project information, including planning, approvals and engagement activities, is maintained on the Powerlink website and should be relied upon as the source of truth.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records.