AUSTRALIA · TENDER
Concrete Block Supply
HumeLink West - Concrete Blocks The UGL-CPB Joint Venture, on behalf of Transgrid, is seeking Expressions of Interest (EOI) from suitably qualified Australian suppliers for the provision of Concrete Blocks for the HumeLink West project in New South Wales. This project involves the expansion of the Wagga Wagga substation, construction of a new substation at G…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- CPB CONTRACTORS PTY LIMITED & UGL ENGINEERING PTY LIMITED
- Buyer address
- NSW Australia
- Status
- Closed
- Opened
- 04 Dec 2024
- Closed
- 23 Dec 2024
- Categories
- Construction, Concrete, Infrastructure
Summary and scope
Transgrid has contracted UGL Engineering Pty Ltd and CPB Contractors Pty Ltd (UGL-CPB JV) to deliver the western portion of the HumeLink project.HumeLink West involves the expansion of the existing Wagga Wagga 500 kV substation, the design and construction of a new substation at Gugaa and connection works to the future Maragle 500 kV substation. The project also includes a new 500 kV double circuit transmission line to connect the substations at the Wondalga interface point with HumeLink East.Initial activities include site investigations and engineering design, followed by enabling civil works primarily for temporary roads and facilities. The HumeLink West team is now establishing procurement and resourcing relationships with local and regional suppliers to support a wide range of activities including:Geotech, survey and engineering design-related worksCivil works and traffic management to install or upgrade approximately 300 kilometres of access tracksWorks to establish 2 temporary 520 and 420-person worker accommodation facilitiesEstablishment of 7 construction equipment laydown areas along the alignmentTransport services for the delivery of steel, concrete and equipmentDesign, preparation and construction of a new substation at Gugaa Required connection works at the future Maragle substationExpansion of the existing Wagga Wagga substationErection and stringing of approximately 360 transmission towersRerouting of approximately 2 km of existing transmission line to the Wagga Wagga substation Required works at the Wondalga interface point.