AUSTRALIA · TENDER
Concept Design & Review of Environmental Factors for the Gloucester Sewage Treatment Plant
The objective of this contract is to undertake a Concept Design to replace the existing Gloucester Sewage Treatment Plant with a new facility. The new plant will be based on the preferred option identified in the option report and will be based on a continuous Modified Ludzack-Ettinger (MLE) system. Below is a summary on the scope of works in relation to thi…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- MidCoast Council
- Buyer address
- 2 Biripi Wy, Taree, New South Wales 2430, Australia
- Status
- Closed
- Opened
- 18 Nov 2020
- Closed
- 11 Dec 2020
- Decision
- 21 Jan 2021
- Categories
- Engineer, Research, Tech services
Summary and scope
The objective of this contract is to undertake a Concept Design to replace the existing Gloucester Sewage Treatment Plant with a new facility. The new plant will be based on the preferred option identified in the option report and will be based on a continuous Modified Ludzack-Ettinger (MLE) system. Below is a summary on the scope of works in relation to this contract: • Part A – Concept Design: -Undertake concept design for the Sewage Treatment Plant including the effluent discharge outfall. -Prepare full project cost construction estimates to a level of accuracy of -10% and +25%. -Prepare a concept design report, including concept level drawings as detailed in this document. The concept design report and drawing package is to be at a level that enables a future design consultant to prepare a complete detailed design package, without the need to conduct further investigations, studies or reports. • Part B – Review of Environmental Factors (REF): -Provide environmental advice and information as input into design development. -Undertake and document assessment of the potential environmental impacts of the project, as defined by the concept design. -Propose and document environmental safeguards and mitigation measures to reduce and manage the project’s risks. -Prepare an REF report to enable Council to make a determination as to whether the project is likely to have significant environmental effects. • Part C – Documentation for Design Contract -Prepare conditions of contract and job specification for design contract for the Gloucester Sewage Treatment Plant.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.