AUSTRALIA · TENDER

Demolish and rebuild retaining wall, Crown St-Ford St

Design and Construct services Design includes: concept design and then design of final retaining wall to include some staircases and handrails preference would be a concrete crib wall (same as renovated area) or any other gravity wall method you think suitable costing of final approved design and split in two phases: phase 1: prior to EFY phase 2: during sec…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Bellingen Shire Council
Buyer address
Hyde St, Bellingen, New South Wales 2454, Australia
Status
Closed
Opened
14 Apr 2021
Closed
12 May 2021
Decision
14 May 2021
Categories
Construction & Operation

Summary and scope

Design and Construct services Design includes: concept design and then design of final retaining wall to include some staircases and handrails preference would be a concrete crib wall (same as renovated area) or any other gravity wall method you think suitable costing of final approved design and split in two phases: phase 1: prior to EFY phase 2: during second half of calendar year Construction works to include: demolition of an existing timber crib retaining wall, removal of vegetation, disposal of wastes reshape batter prepare foundation and erect wall, allowance for stormwater management staircases handrails reseal footpath or road to match seed lawn where required allowance for traffic control, and other requirements associated

Source and freshness

Source update date not provided