AUSTRALIA · TENDER
RFT2021-25 Umbango and The Gap Rural Fire Sheds Design and Construct
Umbango Rural Fire Shed Construction of a 12.0m L x 7.7m W x 4.20m H Colorbond single bay fire shed with a 6m x 8.7m concrete truck standing area fronting the shed. The shed will require new sewer/stormwater drainage and solar electrical supply. 60,000L of water storage will be required on site for filling the fire trucks and for domestic use. The site will…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Wagga Wagga City Council
- Buyer address
- 243 Baylis St, Wagga Wagga, New South Wales 2650, Australia
- Status
- Closed
- Opened
- 09 Jul 2021
- Closed
- 18 Aug 2021
- Decision
- 28 Sept 2021
- Categories
- Architecture, Design, Planning, Construction & Operation
Summary and scope
Umbango Rural Fire Shed Construction of a 12.0m L x 7.7m W x 4.20m H Colorbond single bay fire shed with a 6m x 8.7m concrete truck standing area fronting the shed. The shed will require new sewer/stormwater drainage and solar electrical supply. 60,000L of water storage will be required on site for filling the fire trucks and for domestic use. The site will require approximately 340m2 of gravel hardstand for car-parking and turning around of the fire trucks. This project also involves the construction of a new, approximately 100m long access road to the new shed from Wattle Vale Road. The Gap Rural Fire Shed Construction of a 12.0m L x 7.7m W x 4.2m H Colorbond single bay fire shed with an internal toilet and basin and a 6.0m L x 8.7m W concrete truck standing area fronting the shed. The shed will require new sewer/stormwater drainage and solar electrical supply. 60,000L of water storage will be required on site for filling the fire trucks and for domestic use. The site will require approximately 236 m2 of gravel hardstand for car-parking and turning around of the fire trucks. The shed will also require a connection to the existing Riverina Water main approximately 50m from the building. Included in the scope is the upgrade of the existing side entry from the Gap Hall and Downside Road. This side entry will include the refurbishment of an existing 375mm RC Pipe Culvert.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.