AUSTRALIA · TENDER

Kang Kang Road Footpath Construction Project

Aurukun Shire Council invites suitably qualified and experienced Contractors to tender for the Kang Kang Road Footpath Construction Project The scope of services for Stage 1 works as per for construction drawings attached in Attachment 1, includes the construction of: New in-situ concrete footpaths and formalized residential accesses; Tactile Ground Surface…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Aurukun Shire Council
Buyer address
506 Kang Kang Rd, Aurukun, Queensland 4892, Australia
Status
Closed
Opened
09 Aug 2021
Closed
31 Aug 2021
Decision
13 Sept 2021
Categories
Building Trade, Repairs, Maint., Construction & Operation

Summary and scope

Aurukun Shire Council invites suitably qualified and experienced Contractors to tender for the Kang Kang Road Footpath Construction Project The scope of services for Stage 1 works as per for construction drawings attached in Attachment 1, includes the construction of: New in-situ concrete footpaths and formalized residential accesses; Tactile Ground Surface Indicators (TGSI) at all level road crossings; Transverse enveloping pipes(service conduits); and Raise pedestrian footpath over and install new five (5) 900mmx300mm (2400mm) reinforced concrete box culverts and provided monowills safety rail. The new concrete footpath is to commence at and join to the existing Aurukun Airport Terminal car park upgrade (part of a separate works package). The start chainage is CH0.00m. The footpath is to terminate at CH255 which represents ‘Stage 1’ of the works. Additional lengths of in-situ concrete footpaths and formalized residential accesses may be incorporated into the scope of works under a variation order based on provisional rates supplied by the contractor in the price schedule. The supply of all labor, materials, plant and machinery for the completion of the whole of the Works under the Contract. The complete construction of concrete footpaths and other works, including forming, supply and placing of concrete, jointing, and testing of the Works in approved manner and timeframe.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.