AUSTRALIA · TENDER
Maintenance of Air Conditioning System in Nambucca Valley Council Buildings
The successful Contractor will be required to perform Air Conditioning Maintenance Duties to the cycles nominated in Schedule 3 in Specifications of Works for Nambucca Valley Council. Contractors may also be required to respond to call outs for system/unit failures and will be reimbursed at an agreed rate and agreed response time (information to be provided…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Nambucca Valley Council
- Buyer address
- 44 Princess St, Macksville, New South Wales 2447, Australia
- Status
- Closed
- Opened
- 12 Sept 2021
- Closed
- 14 Oct 2021
- Decision
- 27 Oct 2021
- Categories
- Building Trade, Repairs, Maint.
Summary and scope
The successful Contractor will be required to perform Air Conditioning Maintenance Duties to the cycles nominated in Schedule 3 in Specifications of Works for Nambucca Valley Council. Contractors may also be required to respond to call outs for system/unit failures and will be reimbursed at an agreed rate and agreed response time (information to be provided in the Quotation Form Attachment). General Maintenance Duties for Air Conditioning/Heat Pump Systems Item Maintenance Description 1 Check and clean condenser coils/fan coil units 2 Check and clean drain pan 3 Check and clean condensate drains/tray 4 Leak test all coils and connections 5 Check capacitors 6 Inspect cabinet and for mould growth, remove as required 7 Clean and sanitise evaporator coil for mould and mildew prevention and removal 8 Check and clean air filters 9 Check all supply vents for air circulation 10 Test electrical system (voltage and amps), heating elements, current draw on motors against ratings, controls, capacitors, safety switches, relays, contactors and connections 11 Check crank case heater 12 Check all pumps, reversing valves and auxiliary equipment 13 Check all belts and pulleys for correct operation, undue vibration and rectify 14 Lubricate motor and blower bearings 15 Check for corrosion and treat 16 Check thermostat calibration/set points 17 Check/test refrigerant flow control, pressures and levels 18 Check operating temperatures and drop across coils 19 Clean ceiling cassettes and grilles (can be rotated depending on condition and frequency) 20 Provide report and billing Each system will rely on the manufacturer’s specific recommendations and requirements that the successful tenderer (contractor) will employ to ensure maximum and efficient performance and extended life
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.