AUSTRALIA · TENDER
RFT 2022-17 General Waste Cell & Monocell Design Construction Level 1 Supervision & EPA Approval
Engage an Independent Engineer suitably qualified and experienced in landfill construction verification. They will be responsible for overseeing implementation of the Construction Quality Assurance (CQA) aspects of the works and must be experienced in: • Design and CQA inspection of earthworks and geosynthetic lining (and reinforcing) systems. • CQA inspecti…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Wagga Wagga City Council
- Buyer address
- 243 Baylis St, Wagga Wagga, New South Wales 2650, Australia
- Status
- Closed
- Opened
- 18 Feb 2022
- Closed
- 16 Mar 2022
- Decision
- 10 May 2022
- Categories
- Engineer, Research, Tech services, Environmental & Heritage Services, Waste Management & Landfill
Summary and scope
Engage an Independent Engineer suitably qualified and experienced in landfill construction verification. They will be responsible for overseeing implementation of the Construction Quality Assurance (CQA) aspects of the works and must be experienced in: • Design and CQA inspection of earthworks and geosynthetic lining (and reinforcing) systems. • CQA inspection of all aspects of the geosynthetic lining system construction on a full-time basis. • Compile the As-constructed Report and provide verification of the works against the requirements of the Technical Specification. Other responsibilities of the CQA Engineer will be: • To review and verify the submittals, materials and Contractor CQA processes nominated in the Specification. • To review all earthworks testing and reporting provided by the GTA and GITA and survey and undertake inspections necessary to monitor the works and for the release of Hold Points. • The geosynthetic reinforcement and lining system CQA involvement will include review of materials manufacturer quality assurance (MQA) and independent quality assurance (IQA) information required by this Specification and liner system installation inspection and reporting on a full-time basis. Engage an independent Geotechnical Testing Authority (GTA) to provide inspection and testing services for the subgrade. Engage an independent Geotechnical Inspection and Testing Authority (GITA) to provide full time inspection and testing of engineered fill layer earthworks at Level 1 responsibility. Engage an experienced independent Geomembrane Testing Authority (GMTA) to conduct geomembrane integrity surveys. The as-constructed report and verification of the works are to be submitted to the EPA to gain final approval and sign off of the new constructed cells. All costs associated with these works are to be allowed for including: • Travel, accommodation and associated costs • Attendance at onsite meetings as required
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.