AUSTRALIA · TENDER
RFT 1-22 Summer Hill Reuse Centre
All enquiries to be lodged through the Vendor Panel forum. The work to be performed under this Contract includes but is not limited to the items outlined below and any miscellaneous ancillary works required to achieve the intent as shown on the Contract Documents. The site comprises Summer Hill Reuse Centre located at 7 Prospect Road in the suburb of Summer…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Inner West Council
- Buyer address
- 15 Unwins Bridge Rd, St Peters, New South Wales 2044, Australia
- Status
- Closed
- Opened
- 20 Feb 2022
- Closed
- 14 Mar 2022
- Decision
- 24 Apr 2022
- Categories
- Building Trade, Repairs, Maint., Construction & Operation, Utilities
Summary and scope
All enquiries to be lodged through the Vendor Panel forum. The work to be performed under this Contract includes but is not limited to the items outlined below and any miscellaneous ancillary works required to achieve the intent as shown on the Contract Documents. The site comprises Summer Hill Reuse Centre located at 7 Prospect Road in the suburb of Summer Hill NSW 2130. The work under contract (“WUC”) broadly comprises: Civil work including excavation of private road for the installation of services and releveling accessible parking space. Concrete works, retaining wall and line marking. Hydraulic works: supply and install of a hydraulic and fire services. Supply and installation of new utilities and services; including the upgrades of electrical distribution boards and cabling. Refurbishment of a new public toilets (one fully accessible) Fit out of offices and meeting space. Repair and remediation of buildings including roof repairs, concrete cancer, damaged ceilings, new flooring Removal of hazardous material such as asbestos and contaminated soil. WUC as covered by this Contract includes the planning, management and supervision, ordering, supply and co-ordination of delivery of all materials (unless otherwise specified) and the cost of all labour, equipment, machinery, applications, testing, certificates, shop drawings, profits, overheads and making good as necessary to complete the works as detailed in the Contract Documents. Site works are to commence in April 2022 and are to be completed no later than 15 June 2022.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.