AUSTRALIA · TENDER
Muggins Lane Bridge Replacement (OM)
Maranoa Regional Council invites suitably qualified and experienced Contractors to submit a fixed price lump sum, and supporting documentation, for the design and construction of a new bridge at Muggins Lane, Yuleba Qld 4427, in accordance with the specification. A summary of the brief for the replacement bridge is as follows: • Design and construction of a…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Maranoa Regional Council
- Buyer address
- 1 Cartwright St, Roma, Queensland 4455, Australia
- Status
- Closed
- Opened
- 22 Mar 2022
- Closed
- 09 May 2022
- Decision
- 19 Jun 2022
- Categories
- Construction & Operation
Summary and scope
Maranoa Regional Council invites suitably qualified and experienced Contractors to submit a fixed price lump sum, and supporting documentation, for the design and construction of a new bridge at Muggins Lane, Yuleba Qld 4427, in accordance with the specification. A summary of the brief for the replacement bridge is as follows: • Design and construction of a replacement bridge, immediately upstream of the existing structure • Design of a cantilever walkway on one side of the structure, which can be constructed with the bridge or at a later date • Single span bridge, with similar height to existing structure • Total width of the bridge, including the cantilever walkway to be within the maximum ten (10) metre clearing allowance • Retention of the existing Muggins Lane bridge due to its heritage value • Serviceable bridge life: 100 years (minimum) • Load capacity sufficient for traffic loading as described in AS5100.2-2017 Bridge Design Loads • Design and construction of unsealed road approaches to connect the new bridge with the existing Muggins Lane roadway.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.