AUSTRALIA · TENDER
SMRC TfNSW RMCC 2022/23 Heavy Patch Program
Council is seeking suitably qualified contractors to provide their best quotes to carry out the SMRC (TfNSW) RMCC Heavy Patch program 2022/2023 The contractor is to provide all necessary equipment, traffic controls, operators, gravel, stabilant and primer seal. Heavy patches are to be compacted to the equivalent of 100% standard compaction, graded to existin…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Snowy Monaro Regional Council
- Buyer address
- 81 Commissioner St, Cooma, New South Wales 2630, Australia
- Status
- Closed
- Opened
- 27 Sept 2022
- Closed
- 20 Oct 2022
- Decision
- 09 Nov 2022
- Categories
- Construction & Operation
Summary and scope
Council is seeking suitably qualified contractors to provide their best quotes to carry out the SMRC (TfNSW) RMCC Heavy Patch program 2022/2023 The contractor is to provide all necessary equipment, traffic controls, operators, gravel, stabilant and primer seal. Heavy patches are to be compacted to the equivalent of 100% standard compaction, graded to existing surface levels and primer sealed to match existing road width. • The heavy patch locations and approximate area for each location are as follows:- Kosciuszko road MR286 - Area: 783.24m2 Monaro Hwy SH19 Area: 4782.8m2 Monaro Hwy SH19 Seg 1280 (Bright st, Bombala to the intersection with Delegate road) - Area: 6000m2 Total Area: 11,566.04m2 Council reserves the right to make reasonable alterations/adjustments to the location, details and/or scope of the proposed works in consultation with the selected contractor, without the need for recalling for quotations if a suitable agreement can be reached. Any works that have been agreed by both parties after due consultations made in this regard will not be construed as a Variation.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.