AUSTRALIA · TENDER

SMRC TfNSW RMCC 2022/23 Heavy Patch Program

Council is seeking suitably qualified contractors to provide their best quotes to carry out the SMRC (TfNSW) RMCC Heavy Patch program 2022/2023 The contractor is to provide all necessary equipment, traffic controls, operators, gravel, stabilant and primer seal. Heavy patches are to be compacted to the equivalent of 100% standard compaction, graded to existin…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Snowy Monaro Regional Council
Buyer address
81 Commissioner St, Cooma, New South Wales 2630, Australia
Status
Closed
Opened
27 Sept 2022
Closed
20 Oct 2022
Decision
09 Nov 2022
Categories
Construction & Operation

Summary and scope

Council is seeking suitably qualified contractors to provide their best quotes to carry out the SMRC (TfNSW) RMCC Heavy Patch program 2022/2023 The contractor is to provide all necessary equipment, traffic controls, operators, gravel, stabilant and primer seal. Heavy patches are to be compacted to the equivalent of 100% standard compaction, graded to existing surface levels and primer sealed to match existing road width. • The heavy patch locations and approximate area for each location are as follows:- Kosciuszko road MR286 - Area: 783.24m2 Monaro Hwy SH19 Area: 4782.8m2 Monaro Hwy SH19 Seg 1280 (Bright st, Bombala to the intersection with Delegate road) - Area: 6000m2 Total Area: 11,566.04m2 Council reserves the right to make reasonable alterations/adjustments to the location, details and/or scope of the proposed works in consultation with the selected contractor, without the need for recalling for quotations if a suitable agreement can be reached. Any works that have been agreed by both parties after due consultations made in this regard will not be construed as a Variation.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.