AUSTRALIA · TENDER

Design & Construction of Casino to Bentley Rail Trail Bridges

Council would like to engage a suitably qualified company for design and supply of all materials, plant, and labour for the detailed design and construction of the proposed pedestrian and cycle bridges and bypass bridge approach ramps required for this section of the rail trail. The scope of works includes, but is not limited, to the following: a. Detailed d…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Richmond Valley Council
Buyer address
26 Canning Dr, Casino, New South Wales 2470, Australia
Status
Closed
Opened
26 Jul 2023
Closed
08 Sept 2023
Decision
21 Sept 2023
Categories
Construction & Operation, Engineer, Research, Tech services

Summary and scope

Council would like to engage a suitably qualified company for design and supply of all materials, plant, and labour for the detailed design and construction of the proposed pedestrian and cycle bridges and bypass bridge approach ramps required for this section of the rail trail. The scope of works includes, but is not limited, to the following: a. Detailed design and construction of the proposed bridge structures, balustrades and rock protection to achieve a minimum 50-year design life; b. Site establishment at each work location; c. All required vegetation clearing; d. Installation of appropriate erosion and sediment control measures; e. Establishment of approved traffic management arrangement and maintenance of the measures during the construction period; f. Construction of bulk earthworks where required; g. Construction of the culvert crossings where required; h. Construction of the rail trail pavement where required; i. Construction of the concrete tie ins (relieving slabs) as denoted on the reference drawings; j. For any existing bridges requiring removal the Contractor shall complete all demolition works including disposal of materials off site; k. Remedial works and re-vegetation to disturbed areas; l. Remediation of existing fences and all disturbed areas; and m. Provision of practical completion information, including but not limited to, as constructed drawings and certification of all works. n. Note Bridge 10 is a provisional item, to be confirmed by the Principal.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.