AUSTRALIA · TENDER

RFT2024-15 EFFLUENT POND LINING KOORINGAL AND NARRUNT SEWAGE TREATEMENT WORKS

WWCC operates the Narrung Street STP, which includes primary, secondary and tertiary treatment of the wastewater before discharging to waterways and or recycling it. The original ESP project intended to design and build a front-end storage pond to enable inflow/infiltration flow rates above the STP’s (SBR) design envelope that is being received into the STP…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Wagga Wagga City Council
Buyer address
243 Baylis St, Wagga Wagga, New South Wales 2650, Australia
Status
Closed
Opened
23 Oct 2023
Closed
31 Jan 2024
Decision
29 Apr 2024
Categories
Water & Sewage

Summary and scope

WWCC operates the Narrung Street STP, which includes primary, secondary and tertiary treatment of the wastewater before discharging to waterways and or recycling it. The original ESP project intended to design and build a front-end storage pond to enable inflow/infiltration flow rates above the STP’s (SBR) design envelope that is being received into the STP from the sewer reticulation system during times of flood and/or storm events to be diverted and stored in the ESP up to a volume of 20ML for subsequent withdrawal and treatment immediately after a diversion into the ESP has ceased. WWCC requires the installation of an impervious HDPE liner to the pond with gas venting and anchoring including undertaking of substantial earthworks, including excavation and disposal, grading, levelling and trimming: soil conditioning including dewatering if necessary: compaction: dust control: stockpile shaping and management; and reinstatement. A traffic management plan must be developed and implemented for the project by the contractor.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.