AUSTRALIA · TENDER
Design, Construct & Operate a Landfill Gas Capture System
MidCoast Council invites suitably qualified and experienced Contractors to submit a proposal for the design, construction, and operation of a landfill gas (LFG) capture trial (Part 1) at the operating Taree Landfill and the closed Tuncurry Landfill. Depending on the outcome of the trial, a permanent LFG capture system (Part 2) may/may not be installed at the…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- MidCoast Council
- Buyer address
- 2 Biripi Wy, Taree, New South Wales 2430, Australia
- Status
- Closed
- Opened
- 20 Nov 2023
- Closed
- 16 Feb 2024
- Decision
- 28 Mar 2024
- Categories
- Mining & Quarrying & Oil & Gas
Summary and scope
MidCoast Council invites suitably qualified and experienced Contractors to submit a proposal for the design, construction, and operation of a landfill gas (LFG) capture trial (Part 1) at the operating Taree Landfill and the closed Tuncurry Landfill. Depending on the outcome of the trial, a permanent LFG capture system (Part 2) may/may not be installed at the Taree and Tuncurry Landfills. Part 1 Part 1 of the project is the design, construction, commission, and operation of a trial LFG capture system at both Taree and Tuncurry Landfills. The purpose of which is to determine whether there is sufficient landfill gas present at the sites to run a commercially viable emission reduction project under the Clean Energy Regulator’s ACCU Scheme (formerly known as the Emission Reduction Fund). Further details regarding the expectations and scope for Part 1 can be found at Clause 3.1 of Section D – Specifications. Part 2 The Commencement of Part 2 is solely at the discretion of Council and is contingent on the outcome of Part 1. If Council decides to proceed with Part 2 of the project the Contractor will undertake a turnkey project to design, construct, commission, and operate a permanent LFG capture system at either/both Taree and Tuncurry Landfills. The permanent LFG system will be operated by the Contractor for a period of seven (7) years with an option to extend for a further 5 years (at the discretion of the Council), after which the ownership of the LFG capture system will be transferred to the Council. Further details regarding the scope of Part 2 can be found at Clause 3.2 of Section D – Specifications
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.