AUSTRALIA · TENDER
Stormwater Management Plan Implementation Project – Package 1 – Construction
Wea re seeking supply and construction of stormwater infrastructure at the Byron Resource Recovery Centre, Myocum NSW Package 1 Works will cover the northern, western and south-western sections of the Site as indicated in the Drawings. The scope of works covered by this Technical Specification includes the following: • Construction of open channel swales; •…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Byron Shire Council
- Buyer address
- 70 Station St, Mullumbimby, New South Wales 2482, Australia
- Status
- Closed
- Opened
- 20 Feb 2024
- Closed
- 22 Mar 2024
- Decision
- 21 May 2024
- Categories
- Construction & Operation
Summary and scope
Wea re seeking supply and construction of stormwater infrastructure at the Byron Resource Recovery Centre, Myocum NSW Package 1 Works will cover the northern, western and south-western sections of the Site as indicated in the Drawings. The scope of works covered by this Technical Specification includes the following: • Construction of open channel swales; • Installation of gravel trench drains; • Installation of grated concrete drains; • Installation of concrete pits; • Installation of culverts and headwalls; • Decommissioning of nominated existing surface water drains; and • Decommissioning of a surface water grate and concrete base. These works are expected to be completed May - July 2024.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.