AUSTRALIA · TENDER
TRC000435 Branchview bridge concreting services
Toowoomba Regional Council (TRC) has received funding approval for the replacement of the Branchview Road Bridge. Council intends to replace the existing timber bridge, on a new alignment and construct a new two span concrete bridge. The bridge is located approximately 40km west of Pittsworth on Branchview Road and spans the Condamine River (North Branch). C…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Toowoomba Regional Council
- Buyer address
- 153 Herries St, Toowoomba City, Queensland 4350, Australia
- Status
- Closed
- Opened
- 21 Mar 2025
- Closed
- 15 Apr 2025
- Decision
- 26 May 2025
- Categories
- Building Trade, Repairs, Maint., Construction & Operation
Summary and scope
Toowoomba Regional Council (TRC) has received funding approval for the replacement of the Branchview Road Bridge. Council intends to replace the existing timber bridge, on a new alignment and construct a new two span concrete bridge. The bridge is located approximately 40km west of Pittsworth on Branchview Road and spans the Condamine River (North Branch). Council wishes to procure services of a crew of experienced crews to construct all in-situ structural concrete elements of the new bridge. The works to be undertaken include the falsework, steelwork, formwork, concreting and finishing of all in-situ structural concrete elements in the project. This includes: • Two (2) abutments, • One (1) headstock, • Two (2) relieving slabs, • Two (2) abutment protection structures • Two (2) castellated kerbs along the bridge extent • Concrete margins from Roadworks Package The successful Contractor will be required to work efficiently to complete the required works, in accordance with the design drawings and specifications MRTS70 Concrete and MRTS71 Reinforcing Steel.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.