AUSTRALIA · TENDER
Blackwater WWTP Primary Sediment Tank No1 Travelling Bridge Upgrade
The Primary Clarifier at Blackwater STP is approximately 30 years old and requires refurbishment of most elements to extend the asset life. Majority of the fittings bolted onto the rotating bridge require replacing and the bridge itself requires at a minimum sandblasting and recoating. The V-notch around the launder of the clarifier is also very badly corrod…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Central Highlands Regional Council
- Buyer address
- 65 Egerton St, Emerald, Queensland 4720, Australia
- Status
- Closed
- Opened
- 21 Feb 2024
- Closed
- 15 Mar 2024
- Decision
- 25 Apr 2024
- Categories
- Indust. Production, Manufacturing, Water & Sewage
Summary and scope
The Primary Clarifier at Blackwater STP is approximately 30 years old and requires refurbishment of most elements to extend the asset life. Majority of the fittings bolted onto the rotating bridge require replacing and the bridge itself requires at a minimum sandblasting and recoating. The V-notch around the launder of the clarifier is also very badly corroded and requires replacing. One of the supports for one scraper in the clarifier had snapped off due to corrosion. Clarifier was drained in January 2024 to repair, and a full inspection of this asset was conducted to see full extent of future repairs. Pictures are available on request. As part the RFQ, there will be a site visit conducted on Wednesday 28/02/2024 at 12:00 so all applicants can fully understand the scope of these works however the site visit is not compulsory but advisable to attend.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.