AUSTRALIA · TENDER

Any Opportunities

STORENERGY PTY LTD is inviting expressions of interest for the Molong Battery Energy Storage System (BESS) project, located near Molong, New South Wales. This large-scale energy infrastructure initiative involves the development of a 150MW battery facility designed to provide essential grid support by storing and releasing energy during peak demand. The proj…

Key facts

Buyer
STORENERGY PTY LTD
Location
NSW Australia
Status
Open
Opened
25 Nov 2025
Closing
28 Aug 2026
Decision
Not provided
Categories
Full Scope

Summary and scope

Project: Molong Battery Energy Storage System Project owner: STORENERGY PTY LTD Location: NSW Australia Work package status: Open Scope: Full Scope Work package description: Express interest in any opportunities that may arise for this project. Project overview: Stor-Energy is exploring the development of a large-scale battery to the east of Molong, near Back Saleyards Road. The proposed battery would have a capacity of 150 megawatts (MW) and be capable of operating at full capacity for up to four hours.This battery would store excess energy during the day and release it when demand is high, providing essential support to the electricity grid. The project would connect to the existing Molong Transgrid substation, enhancing the local power network.This initiative is part of a broader effort to create a more stable and resilient energy future. We're committed to engaging with the local community as we continue to assess the potential for this project.The construction of the Molong Battery will be an opportunity for capacity building for local people and local employment in the energy industry. Batteries are a fast-growing part of the electricity system and represent a future-focused and highly skilled industry.Ensuring local people are participating in the project will create a positive legacy in the region and deliver an enduring positive impact on the community in the Molong region and its surrounds.Proposed project components include:Battery units and transformersConnection and switch gearSite officeWater storage facilitiesNew substation in the battery facilityCivil works such as hardstands, internal roads, new access driveway and bulk earthworksTransmission line to the nearby Molong substationThe lead contractor will be appointed soon and will be responsible for the subcontractor workforce.Stor-Energy is committed to ensuring the use of the local workforce where possible, and to training local people to participate in this future-focused industry.Cold and hot commissioning of Battery and substation equipment.Removal of temporary construction facilities and rehabilitation of disturbed areas following completion of construction of the Project.Construction is anticipated to take 22 months and to commence in late 2026.Over that time, the main construction activities will include:Transport of construction personnel, associated heavy and light vehicles, and materials to and from the site on a day-to-day basis, dependent on construction schedule.Site establishment works, including vegetation clearing within the fenced boundary, bulk earthworks, and a temporary construction compound.Road works to formalise the internal site access road to accommodate heavy vehicles.Construction of the Operations & Maintenance building, and delivery and installation of the control room and switch rooms.Construction of project substations, including installation of earthing grid, benching works, transformer bunding, installation of 33kV/132kV main transformers outdoor switchgear, HV busbar and support structure, overhead gantry structures, auxiliary transformer, harmonic filters, and reactive plant.Installation of 132 kV transmission line to facilitate connection to the existing Molong Transgrid substation to the north.Construction of hardstand, gravel all-weather access road and sealed internal roads and curbing.Installation of 33kV reticulation cabling, auxiliary transformers, battery enclosures, and inverter & transformer stations.Construction of ancillary works, including parking areas, water tank, storage structures, stormwater management infrastructure, water containment infrastructure, and security lighting and fencing.Stor-energy encourages local businesses that are interested in working on the Molong Battery to register an expression of interest (EOI) through the ICN Gateway webpage.Information on specific work packages and opportunities will be communicated on the Gateway by ICN project page as it becomes available.For further information, please reach out to Pat Savage at information@molong-battery.com

Source and freshness

Open buyer portal ↗

Source update date not provided

Information shown is sourced from public opportunity records.