Plumbing, Drainage and Pipe Laying Services The Toowoomba Regional Council is seeking expressions of interest from qualified businesses to support the Southern Water Treatment Plant Project in Toowoomba, QLD. This major infrastructure initiative, jointly funded by the Queensland Government and the Council, aims to enhance regional water security through the…
Decide whether this tender fits your team
Your team keeps the bid/no-bid decision.
Request a bid/no-bid review · Search related open tenders
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Toowoomba Regional Council
- Buyer address
- QLD Australia
- Status
- Open
- Opened
- 08 Oct 2026
- Closing
- 09 Oct 2027
- Categories
- Full Scope
Summary and scope
Project: Southern Water Treatment Plant Project Project owner: Toowoomba Regional Council Location: QLD Australia Work package status: Open Scope: Full Scope Work package description: This plumbing services works package is anticipated to be procured and managed by the appointed main contractor as part of the broader delivery of the Project. The plumbing works package is likely to include design support, supply, installation, testing and commissioning of plumbing and associated pipeline infrastructure for the water treatment plant, treated-water reservoir, pumping facilities and connecting water mains. The scope may include potable and non-potable water services, sanitary plumbing and drainage, trade waste systems, valves and fittings installation and required hydrostatic, disinfection and compliance testing. The Drainage works package is likely to include design support, supply, installation and commissioning of stormwater drainage services for the water treatment plant, treated-water reservoir, pumping facilities and connecting water mains. The scope may include gravity drainage installation, pre-cast and cast in-situ stormwater pit construction, culverts and associated structures, modification to existing stormwater pits, pipe relining and associated trenching and reinstatement. The pipe-laying works package is likely to include the supply, installation, testing and commissioning of buried and above-ground pipelines associated with the water treatment plant, treated-water reservoir, pumping facilities and connecting water mains. The scope may include survey and set-out, excavation, trench support, dewatering, bedding, pipe laying and jointing, installation of valves, fittings, thrust restraints, chambers and connections, trenchless installation, shutdowns and tie-ins to existing infrastructure, reinstatement and required hydrostatic, disinfection and compliance testing. The contractor may also be required to coordinate utility crossings and traffic requirements. Project overview: Overview Toowoomba Regional Council (Council) is planning the delivery of a new water treatment plant (Southern Water Treatment Plant Project) to meet growing regional demand and enhance the security and resilience of the region's potable water supply. The new Toowoomba to Warwick Pipeline provides an opportunity for Council to access an additional raw water source in the south-western Toowoomba Region. Integrating a new potable water supply asset into Council's network would increase treatment capacity, reduce reliance on the existing Mt Kynoch Water Treatment Plant and support the region's future growth and long-term water security. The Project is expected to comprise: a new water treatment plant with a nominal capacity of 25 ML/day, with provision for future expansion up to 50ML/day, together with associated distribution infrastructure; approximately 14.7 km of trunk water mains; a pipeline from SWTP to Mt Peel Reservoir; a Drayton Booster Pump Station; a water storage reservoir near Mount Peel Bushland Reserve; and a raw-water offtake from the Toowoomba to Warwick Pipeline. The Project will be jointly funded by the Queensland Government and Council and designed to be delivered as a single, integrated package of works by the successful D&C Contractor. Delivery Schedule The Project is currently going through a competitive two-stage procurement process that will be used to select a suitability qualified contractor for the Project. It is forecast that the Preferred Contractor will be appointed in early March 2027. Early Works are scheduled to commence on site Q3 2027, with the forecast date for completion between Q2-Q3 2029. Expression of Interest Council invites local and regional businesses interested in supplying goods, services or works to the Project to register an Expression of Interest (EOI) through this ICN Gateway Project page. Council is committed to supporting local suppliers, strengthening industry capability and maximising local participation, with particular emphasis on businesses and workers located within Council's Local Government Area (LGA). This EOI provides businesses with an opportunity to outline their capabilities and be considered for potential supply and subcontracting opportunities associated with the Project. Specific supply and work package opportunities will be published on this page as they become available. Interested businesses should: ensure their ICN Gateway company profile is complete, current and accurate; enable email notifications for relevant supply opportunities; register their interest against applicable opportunities as a full or partial scope supplier, where relevant; and respond fully to all Project-specific and work package-specific questions. Information submitted through ICN Gateway will be made available to shortlisted head contractors during the Early Contractor Involvement (ECI) Phase. This will assist prospective head contractors to identify capable suppliers, establish effective supply chains and develop strategies that maximise local and regional industry participation. Registration of an expression of interest does not guarantee engagement, inclusion in the Project supply chain or progression to a subsequent procurement stage. Businesses that demonstrate the capability and capacity to meet relevant work package and prequalification requirements may be invited to participate in future procurement or Request for Tender processes.