Installation of Crane and Lifting Equipment
Voith Snowy 2.0 Crane and Lifting Equipment Installation Voith Hydro GmbH & Co. KG is seeking contractors for the installation and commissioning of crane and lifting equipment as part of the Snowy 2.0 pumped storage project in New South Wales, Australia. This major infrastructure project connects the Tantangara and Talbingo Dams to provide 2,000 megawatts of…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Voith Hydro GmbH & Co. KG
- Buyer address
- NSW Australia
- Status
- Closed
- Opened
- 13 Apr 2023
- Closed
- 12 Feb 2024
- Categories
- Construction, Engineering, Mechanical Installation, Hydropower
Summary and scope
The pumped storage station Snowy 2.0 will connect two existing dams of the Snowy Scheme, Tantangara Dam and Talbingo Dam, through underground tunnels and an underground power station with pumping and generating capacity.The underground power station will house six reversible Francis-type pump turbines. The capacity of the plant is designed for 2.000 megawatts and allows 175 hours of storage. The first power out of Snowy 2.0 is expected early in 2024. The project can thus make a significant contribution, both to grid stabilization and to the further expansion of power generation from renewable energy.