AUSTRALIA · TENDER

Installation of Intake Hydraulic Steel Structures

Installation of Intake Hydraulic Steel Structures - Snowy 2.0 Voith Hydro GmbH & Co. KG is seeking contractors for the installation of intake hydraulic steel structures as part of the major Snowy 2.0 pumped storage project in New South Wales, Australia. This project connects the Tantangara and Talbingo dams to provide 2,000 megawatts of capacity and 175 hour…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Voith Hydro GmbH & Co. KG
Buyer address
NSW, Australia
Status
Closed
Opened
13 Apr 2023
Closed
16 May 2023
Categories
Hydropower, Construction, Energy Infrastructure, Steel Structures

Summary and scope

The pumped storage station Snowy 2.0 will connect two existing dams of the Snowy Scheme, Tantangara Dam and Talbingo Dam, through underground tunnels and an underground power station with pumping and generating capacity.The underground power station will house six reversible Francis-type pump turbines. The capacity of the plant is designed for 2.000 megawatts and allows 175 hours of storage. The first power out of Snowy 2.0 is expected early in 2024. The project can thus make a significant contribution, both to grid stabilization and to the further expansion of power generation from renewable energy.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.