Solid Residue Storage Facility Design
ASM Dubbo Project - Solid Residue Storage Facility Design Australian Strategic Materials (ASM) is seeking expressions of interest from experienced design organisations to provide detailed design services for the Solid Residue Storage Facility (SRSF) at the Dubbo Project in New South Wales. This project is a critical component of ASM's mine-to-metals strategy…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- AUSTRALIAN STRATEGIC MATERIALS (HOLDINGS) LTD
- Buyer address
- Dubbo, NSW
- Status
- Closed
- Opened
- 19 Jun 2023
- Closed
- 15 Jul 2023
- Categories
- Engineering Design, Geotechnical Services, Mining Infrastructure, Environmental Consulting
Summary and scope
The approved Dubbo Project contains a Solid Residue Storage Facility (SRSF) as part of its mineral processing infrastructure. Previous SRSF studies have been undertaken throughout the project life cycle. ASM is now progressing the design into a final detailed design phase. The scope for this phase is included below. SCOPE OF PACKAGE Management Services . Management and reporting of design activities . Planning and where required, site based services to support geotechnical and geochemical investigations . Coordination with Non Process Infrastructure Study Lead and Tailings Pipeline specialist Design Services . Undertake trade off studies which will include location / staging and Life of Mine Options . Design Review of the current proposed SRSF including an assessment of Industry Best Practice . Design of the geotechnical and geochemical program to support design services . Production of revised detailed design quantities are to be provided - with estimate to be coordinated and assembled by the Non Process Infrastructure Consultant