AUSTRALIA · TENDER
CWO-T-EHB.010- Supply Auxiliary Transformers -
Central-West Orana Renewable Energy Zone (REZ) Transmission Project ACEREZ, in partnership with the ACCIONA COBRA Joint Venture (ACJV), is developing the Central-West Orana REZ Transmission Project in New South Wales. This major infrastructure initiative involves the construction of 90km of 500kV and 150km of 330kV transmission lines to facilitate generator…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- ACEREZ
- Buyer address
- NSW, Australia
- Status
- Closed
- Opened
- 06 Mar 2024
- Closed
- 24 Mar 2024
- Categories
- Electrical Engineering, Power Transmission, Manufacturing, Renewable Energy
Summary and scope
The Base Scope of Works comprises of the design, manufacturee, testings and supply of:22/33kV 3MVA Dyn11 Auxiliary Transformer, inclusive of a 22kV RMU per transformer, 22/0.4kV 500kVA Dyn11 Auxiliary Transformers, 33/0.4kV 500kVA Dyn11 Auxiliary Transformer, 33/0.4kV 500kVA ZNyn11 Earthing Transformer, All Auxiliary and Earthing Transformers shall be shipped to Port Botany in Sydney, New South Wales, Australia (CIF incoterms).