AUSTRALIA · TENDER
CWO-T-TXL.017 - Grape ACSR/GZ -
Central-West Orana Renewable Energy Zone (REZ) - Conductors Supply ACEREZ, through its appointed Design and Construct Contractor, ACCIONA COBRA Joint Venture (ACJV), is seeking suppliers for the design, testing, manufacture, and supply of conductors for the Central-West Orana REZ Transmission Project in New South Wales. This major infrastructure project invo…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- ACEREZ
- Buyer address
- NSW, Australia
- Status
- Closed
- Opened
- 06 Mar 2024
- Closed
- 24 Mar 2024
- Categories
- Electrical Infrastructure, Transmission Lines, Manufacturing, Renewable Energy
Summary and scope
ACCIONA COBRA Joint Venture (ACJV) has been appointed by ACEREZ as the Design and Construct Contractor to build the Central-West Orana REZ Transmission Project. The project consists of 90km of 500kV overhead transmission lines and 150km of 330kV transmission lines for generator connections, stretching from Elong Elong in the west through to Barigan Creek in the east, via an energy hub at Merotherie.