Protection Equipment

Project: Liddell Battery Energy Storage System Project owner: FLUENCE ENERGY PTY LTD Location: NSW Australia Work package status: Awarded Scope: Full Scope Work package description: Local qualified Protection & Commissioning engineers available to assist during the Commissioning works Project overview: Liddell Battery Energy Storage System Project Project Ov…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
FLUENCE ENERGY PTY LTD
Buyer address
NSW Australia
Status
Closed
Opened
22 Jul 2024
Closed
30 Sept 2024
Categories
Full Scope

Summary and scope

Project: Liddell Battery Energy Storage System Project owner: FLUENCE ENERGY PTY LTD Location: NSW Australia Work package status: Awarded Scope: Full Scope Work package description: Local qualified Protection & Commissioning engineers available to assist during the Commissioning works Project overview: Liddell Battery Energy Storage System Project Project Overview:Fluence Energy have been engaged formally by AGL Liddell BESS Pty Ltd to execute a design, engineer, manufacture, procure, supply, construct, deliver, install, commission and test the Facility.The Facility will include a 500 MW/1000 MWh battery energy storageSystem (BESS)The strategy is for Fluence & balance of plant contractor to take the Project through full EPC execution.As part of the early design phase , Fluence is looking to get some high-level budget pricing on key selected packages to understand the Order of Magnitude cost. A formal inqury for these packages will be followed in due course once the engineering design is progressed to sufficient detail.Project BackgroundThe Project objective is to develop a Battery Energy Storage System (BESS) with a capacity of approximately 500 megawatts (MW) and 1,000 megawatt-hour (MWh) (Facility), designed as two independent generating systems of 250 megawatts (MW) and 500 megawatt-hour (MWh) each, which join together on the 330kV transmission before the Point of Connection (PoC). The Project would provide a range of network services to augment the reliability of energy supply, provide storage and firming capacity to the National Energy Market (NEM) as well as additional services to assist grid stability including frequency control ancillary services.It will involve the construction and operation of the BESS as well as an associated 330kV overhead powerline (OHL). The BESS is located to the south of the existing Liddell Power Station. The OHL extends from the BESS to the existing grid connection at the Liddell Switchyard (west of the Liddell Power Station).Fluence will entertain any local interest for the Liddell BESS project.More information about this project you may find hereHow to register an Expression of Interest (EOI)- Work packages currently available to submit an EOI for are listed in the 'Work Packages' tab above. Refer to the 'EOI User Guide' below for instructions and assistance to submit an EOI.- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.ICN Gateway Company Registration- Click here to register your company profile on ICN Gateway.- Support and assistance are available through the document 'Creating an ICN Gateway Company Profile' below.- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.