AUSTRALIA · TENDER

CWO-T-TXL.026 - Concrete Precast Foundation

Central-West Orana Renewable Energy Zone (REZ) - Precast Pile Cap Elements ACEREZ, through the ACCIONA COBRA Joint Venture (ACJV), is overseeing the development of the Central-West Orana REZ Transmission Project in New South Wales. This project involves the construction of 90km of 500kV and 150km of 330kV overhead transmission lines connecting Elong Elong to…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
ACEREZ
Buyer address
Merotherie, NSW
Status
Closed
Opened
17 Oct 2024
Closed
08 Nov 2024
Categories
Construction, Manufacturing, Precast Concrete, Transmission Infrastructure

Summary and scope

The precast pile cap element is supported by four micropiles underneath which are used as a foundation to support the tower erection and serviceability. The precast unit measures 4210mm in length, 1300mm in width and 800mm in height, with an approximate weight of 10 tons. It features four conical openings for micropile installation and embedded rag bolts for attaching tower leg stubs.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.