AUSTRALIA · TENDER

Welding and NDT Testing for TBM 4

Snowy 2.0 - Welding of TBM 4 components Future Generation JV is managing the construction of the Snowy 2.0 project on behalf of Snowy Hydro Limited. This opportunity relates to the provision of specialized welding services for TBM 4 components as part of the large-scale pumped-hydro energy storage expansion in New South Wales. Scope of Work The successful co…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Future Generation JV
Buyer address
NSW Australia
Status
Closed
Opened
18 Nov 2024
Closed
03 Dec 2024
Categories
Construction, Engineering, Welding, Energy Infrastructure

Summary and scope

Future Generation is a joint venture created specifically to build Snowy 2.0 on behalf of Snowy Hydro Limited. We bring the combined engineering expertise of three companies - Italy's Salini Impregilo, Australian-based Clough and US-based Lane Construction. Our team's pair local expertise with global experience.Snowy 2.0 will supercharge the Snowy Scheme's existing hydro-electric generation and large-scale storage capabilities. The fast-start, on-demand generation of pumped-hydro and Snowy 2.0's massive storage capacity will be vital as more intermittent, renewable energy sources such as wind and solar come online and coal-fired power stations retire.Snowy 2.0 will add 2,000 megawatts of energy generation and provide 175 hours of storage for the National Electricity Market (NEM), enough to ensure the stability and reliability of the system during prolonged weather events, such as wind or solar 'droughts'.Snowy Hydro already plays a critical role in ensuring system stability and at times of peak demand, we keep the lights on. Snowy 2.0 will enhance our existing capability and ensure that we can continue to provide increased stability and security to the energy market well into the future.The project links two existing Scheme dams, Tantangara and Talbingo, through tunnels and an underground power station with pumping capabilities. Hydro-power will be generated by falling water spinning Snowy 2.0's giant reversible turbines, which can also pump water in the opposite direction.Snowy 2.0's pumping capabilities work in a 'closed' system - water is recycled between the upper dam (Tantangara) and lower dam (Talbingo) so the same water can be used to generate power more than once, making the most of available water. Snowy Hydro already has pumped-hydro capabilities at the Tumut 3 Power Station - it is proven technology used across the worldThe ability to store water and generate power on-demand means Snowy 2.0 can be 'switched on' very quickly. Snowy 2.0 will pump water using the excess electricity in the system at times of low demand. Then, when energy is needed most, the stored water will be used to generate electricity within minutes.For example, if the wind is blowing in the middle of the night when consumers are asleep, Snowy 2.0 can use the wind energy to pump and then store the water in the upper dam. When households wake up and the demand for energy soars, Snowy 2.0 can quickly generate energy for the grid.The first power produced from Snowy 2.0 is expected in late 2024-25, with progressive commissioning on the six units. Snowy 2.0's operating life is expected to be consistent with the Snowy Scheme's existing assets, which continue to operate reliably many decades after installation.