CWO-T-SEW.066 - Photovoltaic (PV) Battery Energy Storage System (BESS)

Central-West Orana Renewable Energy Zone (REZ) - Solar PV and BESS ACEREZ, in partnership with the ACCIONA COBRA Joint Venture (ACJV), is developing the Central-West Orana REZ Transmission Project in New South Wales. This project involves the construction of extensive 500kV and 330kV transmission infrastructure. As part of this development, a turnkey solutio…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
ACEREZ
Buyer address
NSW Australia
Status
Closed
Opened
12 Dec 2024
Closed
17 Jan 2025
Categories
Solar PV, Battery Energy Storage System (BESS), Electrical Engineering, Construction, Renewable Energy

Summary and scope

ACCIONA COBRA Joint Venture (ACJV) has been appointed by ACEREZ as the Design and Construct Contractor to build the Central-West Orana REZ Transmission Project. The project consists of 90km of 500kV overhead transmission lines and 150km of 330kV transmission lines for generator connections, stretching from Elong Elong in the west through to Barigan Creek in the east, via an energy hub at Merotherie.