AUSTRALIA · TENDER

Design & Construct Casino Suspension Bridge

This tender has been called to engage a suitably qualified and experienced organisation to design and construct the Casino Suspension Bridge, located at McAuliffe Park (DP1056270), and crossing the Richmond River into Queen Elizabeth Park (DP755627) in Casino NSW 2470. The works to be included in this tender are: • A concept design must be produced, and feed…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Richmond Valley Council
Buyer address
10 Graham Pl, Casino, New South Wales 2470, Australia
Status
Closed
Opened
21 Jan 2025
Closed
27 Feb 2025
Decision
27 Mar 2025
Categories
Construction & Operation

Summary and scope

This tender has been called to engage a suitably qualified and experienced organisation to design and construct the Casino Suspension Bridge, located at McAuliffe Park (DP1056270), and crossing the Richmond River into Queen Elizabeth Park (DP755627) in Casino NSW 2470. The works to be included in this tender are: • A concept design must be produced, and feedback sought from the principal prior to proceeding to a detailed design. o Consideration to be taken regarding lighting of the bridge and its approaches. o Minimum width to be 3 metres. • Following feedback on concept design, preparation of engineering design ready for construction. • The tenderer is to prepare: o REF o Safety Management Plan o Traffic Management Plan o Contractor’s Environmental Management Plan o Sediment & Erosion Control Plan o Flood Management Plan o A Fisheries Permit needs to be obtained by the contractor. • The tenderer is to procure materials and carry out the construction of the project. • Construction of cable suspension bridge per the approved design informed by the geotechnical report and survey. • Site establishment and site clean-up and rehabilitation of disturbed areas. • Works are to be completed and the bridge operational by 30 June 2025.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.