AUSTRALIA · TENDER
CWO-T-CIV.129 - Bridge Piling
Central-West Orana Renewable Energy Zone (REZ) Pile Installation ACEREZ, through the ACCIONA COBRA Joint Venture (ACJV), is seeking contractors for pile installation works associated with the Central-West Orana REZ Transmission Project in New South Wales. This project involves the construction of 90km of 500kV and 150km of 330kV transmission lines connecting…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- ACEREZ
- Buyer address
- NSW, Australia
- Status
- Closed
- Opened
- 04 Feb 2025
- Closed
- 26 Feb 2025
- Categories
- Construction, Piling, Civil Engineering, Transmission Infrastructure
Summary and scope
ACCIONA COBRA Joint Venture (ACJV) has been appointed by ACEREZ as the Design and Construct Contractor to build the Central-West Orana REZ Transmission Project. The project consists of 90km of 500kV overhead transmission lines and 150km of 330kV transmission lines for generator connections, stretching from Elong Elong in the west through to Barigan Creek in the east, via an energy hub at Merotherie.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.